User's Manual Part 4

ROI-S05752 Maintenance
-37-
CPU Reset
5 Click on the “CPU Reset” button,
6 Click on the control button “CTRL” for IDU or “ODU” and
“No. 1 or No. 2” (in 1+1 ODU only), and click “Execute” button
in CPU Reset dialog box,
Caution: The control affects the radio link connection.
Check with ROM (Program) Switching check box when the program
file for
CTRL or ODU is newly down loaded and existing program
file will be replaced with new one.
Note: When Click on the “Execute” button to reset CPU of the CTRL,
then CTRL restarts, the LCT is disconnected.
Access the LCT to the NLITE E NEO from the beginning.
7 Click on the “Close” button to dismiss the “CPU Reset” dialog
box,
PMON Clear
8 Click on the “PMON Clear” button,
Perform this operation when beginning the service operation to
delete all PMON and RMON data that were produced in
installation,
9 Click on the “Execute” button,
10 Click on the “Close” button when “OK” is displayed in Progress
area,