Installation Guide

Drop & Lock Glueless Floating Floor
Installation Instructions
3580 Corporate Dr. | Dalton, GA 30720 USA
Phone: 800-404-2675 | Fax: 706-733-8120 | www.usfloorsllc.com
ATTENTION! READ BEFORE INSTALLING!
COLOR VARIATION
This flooring is a natural product and color variations are to be expected. For best visual effect, shuffle planks from several
cartons and do not install boards varying greatly in color next to one another.
ACCLIMATION
As relative humidity varies in different parts of the country, acclimation of the flooring prior to installation is the most
important precaution to take in order to insure a successful installation. Proper acclimation is necessary to adapt the
moisture content of the flooring to the conditions of your environment. Improper acclimation can cause the floor to buckle
and/or the boards to shrink or cup after installation.
SUBFLOOR PREPARATION
Subfloor must be level, dry and free of imperfections. An uneven subfloor will make the floor feel unstable and cause
premature damage.
Drop & Lock Glueless Floating Floor
Installation Instructions
READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. IN ADDITION TO THESE INSTRUCTIONS,
WE RECOMMEND THAT THE INSTALLER FOLLOW ALL INSTALLATION GUIDELINES AS SET FORTH BY THE NATIONAL WOOD
FLOORING ASSOCIATION. If the following instructions leave any unanswered questions or if additional information is required, please
call USFloors toll free at 800-404-2675 (706-733-6120).
FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION
Responsibility for the suitability of USFloors flooring and accompanying products for each individual installation cannot be
assumed by USFloors, since USFloors has no control over the installer's proper application. Should an individual plank be
doubtful as to appearance or dimension the installer should not use this piece. USFloors will send replacement in a timely
fashion.
NOTE: USFloors Drop & Lock flooring may be installed with a direct glue-down method on approved wooden (or) concrete
substrates that are on (or) above grade only. Use only USFloors Wood and Bamboo Flooring Adhesive (or) comparable
moisture cured urethane adhesives (i.e. Bostik’s Best). Please consult with adhesive manufacturer to determine if suitable for
use with this material.
PRE-INSTALLATION JOBSITE REQUIREMENTS
USFLOORS cannot be held responsible for site conditions.
Carefully examine the flooring prior to installation for grade, color, finish and quality. Ensure adequate lighting for proper inspection. If
flooring is not acceptable, contact your supplier immediately and arrange for replacement. USFLOORS cannot accept
responsibility for flooring installed with visible defects. Prior to installation of any flooring, the installer must ensure that the jobsite and
subfloor meet the requirements of these instructions. USFLOORS is not responsible for flooring failure resulting from unsatisfactory
jobsite and/or subfloor conditions.
Flooring should be one of the last items installed in any new construction or remodel project. All work involving water or moisture should
be completed before flooring installation. Water and wood do not mix. Installing flooring onto a wet subfloor will most likely cause
cupping, tip & edge raising, telegraphing of core and subsequent gapping.
Crawl spaces must be a minimum of 18′′ (46 cm) from the ground to the underside of the joists. A ground cover of 6–20 mil black
polyethylene film is essential as a vapor barrier with joints lapped 6′′ (15 cm) and sealed with moisture resistant tape. The crawl space
should have perimeter venting equal to a minimum of 1.5% of the crawl space square footage. These vents should be properly located
to foster cross ventilation. Where necessary, local regulations prevail.
Room temperature and humidity of installation area should be consistent with normal, year-round living conditions for at least one week
before installation of flooring. Maintaining an optimum room temperature of 70
o
F and a humidity range of 30-50% is recommended.

Summary of content (4 pages)