Technical Specifications

The visible surface of your Zip-UP
UnderDeck
®
System. .
1’ Width / 12ft. and 16ft. lengths
QUANTITY NEEDED____________
(each)
The main mounting pieces that will run
the length of your room attached to your
joists.12ft. and 16ft. lengths
QUANTITY NEEDED____________
(each)
The “E” shaped trim that attaches to the
walls or joist around the entire periphery.
12ft. and 16ft. lengths
QUANTITY NEEDED____________
(each)
Used to impart a slope of 1/8 inch per
foot in order to properly drain your under
deck system in the direction of your
gutter. Pitch rails are placed every 4 feet
to provide proper pitch (see illustration).
12ft. lengths
QUANTITY NEEDED____________
(each)
Used to impart a slope of 1/8 inch per
foot in order to properly drain your under
deck system in the direction of your
gutter. Pitch rails are placed every 4 feet
to provide proper pitch (see illustration).
12ft. lengths
QUANTITY NEEDED____________
(each)
Allows for the extension of your ceiling
application by capping the ends of your
Main Rails that do not end at Wall Trim.
The next section is installed the same as
the rst. 12ft. length
QUANTITY NEEDED____________
(each)
*See back of sheet for PLANNING GRID
INSTALLS IN 5 EASY STEPS!
1. Attach pitching rails for drainage.
2. Attach wall trim around the perimeter of the deck.
3. Insert the first panel into the wall trim, and seal
as instructed in the installation guide.
4. Attach the first main rail to the first panel.
5. Secure the main rail to the pitch rail.
Repeat steps 3-5 across the room.
OK TO PHONE 888 449 4787 FOR DESIGN AND ASSEMBLY ASSISTANCE
888.449.4787
Seam Trim
Wall Trim
Main Rail
Ceiling Panel
1 Inch Pitching Rail
1/2 Inch Pitching Rail

Summary of content (2 pages)