User's Manual

68P80801H45-1 1/20/2002 45
EBTS System Manual - Vol 2 Troubleshooting
QUAD Channel Base Radio/Base Radio FRU Replacement Procedures
1. Remove power from the Base Radio by setting the Power Supply ON/OFF
switch to the OFF position.
2. Tag and disconnect the cabling from the BR rear panel connectors.
3. Remove the Power Amplifier module to reduce the BR weight. Remove the
two M10 Torx screws that secure the Power Amplifier module. Slide the
module out of the chassis.
4. Remove the four M30 TORX screws which secure the BR front panel to the
Equipment Cabinet mounting rails.
5. While supporting the BR, carefully remove the BR from the Equipment
Cabinet by sliding the BR from the front of cabinet. When the BR becomes
free from its mounting rails, be sure to fully support it.
Installation
Install BR in Equipment Cabinet as follows:
CAUTION
!
CAUTION
!
A Single Carrier BR can weigh up to 76 LBS (34 KG). A
Quad Carrier BR can weigh up to 91 LBS (41 KG).
Handle the BR with extreme caution, and according to
local health and safety regulations.
1. If adding a BR, install side rails in the appropriate BR mounting position in
the rack.
2. Remove the Power Amplifier module to reduce the BR weight. Remove the
two M10 Torx screws that secure the Power Amplifier module. Slide the
module out of the chassis.
3. While supporting the BR, carefully lift and slide the BR in the Equipment
Cabinet mounting position.
4. Secure the BR to the Equipment Cabinet mounting rails using four M30 Torx
screws. Tighten the screws to 40 in-lb (4.5 Nm).
5. Slide the Power Amplifier module back into the BR chassis. Replace two
M10 Torx screws that secure the Power Amplifier module. Secure the
module by tightening the screws to the specified torque of 5 in-lbs.
6. Connect the cabinet cabling to the BR. Refer to Backplane figure XX.
7. Perform BR activation as described below.