Installation plan Tumble dryer PT 8807 EL (Electrically heated) en - US 38.15 Mat. NR.
U.S.A. Miele, Inc. National Headquarters 9 Independence Way Princeton, NJ 08540 Phone: 800-991-9380 Fax: 609-419-4241 www.mieleusa.com Technical Service & Support Nationwide Phone: 800-991-9380 Fax: 800-220-1348 proservice@mieleusa.com It is essential to read the operating and installation instructions before installing, commissioning or using the machine. This avoids the risk of accidents or damage. All rights reserved Mat. NR.
Technical datasheet Tumble dryer: Heating: PT 8807 Electric (EL) Legend: en - US Abbreviations in bold type: Connection required Abbreviations in circle with dashes: Connection optional or required depending on model version Optional extras: BS Concrete base Quality and density of concrete must comply with load. Concrete plinth must be firmly secured to floor! Recommended height Minimum height Minimum width Minimum depth 4“ 2“ 47“ 55“ mm mm mm mm 100 50 1.200 1.
Air intake Standard connection: Air intake from installation site Unobstructed air intake into room recommended (corresponding to 3 times the vent cross-section of machine) A sufficient supply of fresh air should be ensured to replace the air extracted. cm² 531 32 cu in mm mm 161 160 6 ½“ 6 ¼“ Without base 2 × clamps 2 × screws DIN 571 (Ø × length) 2 × rawl plugs (Ø × length) The machine should be bolted to the floor. Fixing materials for a floating screed floor are to be provided on site.