Assembly Instructions

PREPARE:
TABLE OF CONTENTS
4
PREPARE
Prep - Level 2
Materials List
Tool Check List
Foundation Guidelines
ASSEMBLE:
Level 3 - Level 4
Level 5 - Level 6
Finished Elevations
ENJOY:
Use and Care Instructions
More Concrete Block Ideas
2
3
3
5
6
7
8
9
10
11
12
13
14
15
16
17
Level 7 - Level 8
HOLLERUD FOUNTAIN DIMENSIONS
Level 9 - Level 10
Level 11 - Level 12
Level 13 - Level 14
18
19
20
Level 15 - Level 16
Level 17 - Level 18
Level 19 - Level 20
Level 21 - Level 22
Level 23 - Level 24
Completed Fountain
Follow suggestions on page 3 to build a proper foundation before starting your new project. If not
already set, place the rst level of block 1- 2” below grade, level and ll in any gaps. Use Level 1
as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to adhering
each level to the previously laid block, place the entire level of blocks and check to make sure it
ts properly. Remove small sections at a time to place 1/4-3/8” bead of adhesive.
Wait a minimum of two days before using the fountain.
INSTALLATION INSTRUCTIONS
* Do not over apply adhesive. It may reduce effectiveness. Use mineral spirits to remove any unwanted adhesive.
4’ 2¾”
3’
5’ 11 ¾”