www.maykke.
INSTALLATION INSTALLATIONAND ANDCARE CAREGUIDE GUIDE INSTALLATION AND CARE GUIDE VITREOUS CHINA CHINA VANIT VANIT TOP TOP VITREOUS PRODUCT INSTALLATION PRODUCT INSTALLATION A RONBOW COMPANY A RONBOW COMPANY VANITYTOP TOP VANITY MODEL:DT5025 DT5025 MODEL: DT5031 DT5031 NOTICE: Do or the product ininany way. PRODUCT INSTALLATION NOTICE: Donot notchange change ormodify modify theTOP product any way.
P PRODUCT INSTALLATION A RONBOW COMPANY INSTALLATION AND CARE GUIDE 1. PREPARING THE TOP: Install the faucet into the ons of the • ). pre-drilled locations of the vanity uctions to top (faucet and drain not included) • Follow the manufacturer’s installation instructions to install the faucet and drain. • Do not over tighten the faucet system to avoid unnecessary damage to the vanity top. avoid 2. PREPARING THE VANTIY: nity not dust from to the top d will act anity.
INSTALLATION AND CARE GUIDE 4. DRYING TIME • Allow at least 24 hours for the silicone to fully dry. • During this time avoid moving the vanity top. CARE GUIDE: Care: Rinse thoroughly and use a soft cloth to wipe the product dry after each use to prevent hard water stains. Cleaning: Soft abrasive cleaners may be used when necessary.