Installation Instructions

Tools Typically Required
Kraft paper or other material to protect surrounding area.
Safety Precautions:
Well-ventilated area, safety glasses.
Preparation:
For best performance, the adhesive and materials should be between 65°F (18°C) and 95°F (35°C). Shake can well before using
(approximately 10 12 times). Surfaces must be clean, dry and free of foreign materials. Protect finished surfaces. Pre-fit all
materials. Test substrates for compatibility before starting application.
Application:
Turn spray tip so that the black dot is aligned with the nozzle. Hold can in a vertical position and spray from a distance of 8 to 10
(20 to 25 cm). Keep the can moving to create an even coat and avoid build-up on the surface. Start and stop the spray just off the
work to prevent runs and sags. Repositionable / temporary bonds: Apply a light even coat to one surface. After a few seconds, join
and press together lightly. To remove, gently peel from corner. For a stronger immediate bond, apply an even medium coat of
adhesive to both surfaces, allow to dry to tack (approximately 1 minute), and then bond materials. Porous surfaces may be bonded
while still wet.
Clean-up:
After use, invert spray can and spray for approximately 2 seconds (or until spray is free of adhesive) to clear valve and spray tip.
Clean spray tip with turpentine or mineral spirits. Note: When using solvents for cleanup, use proper precautionary measures.

Summary of content (1 pages)