OUTDOOR STORAGE MODEL N° 60018 Co py OWNER’S MANUAL Keep this Identification Number in case you must contact our Customer Service Department.
IMPORTANT! PLEASE READ BEFORE BEGINNING ASSEMBLY Dear Valued Customer, We would like to congratulate you on your purchase of a Lifetime© Outdoor Storage Shed! We are confident that you have made the perfect choice and you will be very pleased with your new storage solution. Lifetime© Outdoor Storage is part of the family of products created and manufactured by Lifetime® Products, Inc.
IMPORTANT! PLEASE READ BEFORE BEGINNING ASSEMBLY t #FGPSF CFHJOOJOH BTTFNCMZ SFNPWF UIF 1BSUT -JTU GSPN UIF DFOUFS PG UIJT 0XOFS T .BOVBM BOE UBLF BO inventory of the parts included with your Outdoor Storage Shed. Also, read through the entire instruction manual. It’s always a great practice to get a feel for the flow of the process and to familiarize yourself with the parts involved. But, try not to get ahead of yourself and start the process out of order.
REGISTER YOUR LIFETIME PRODUCT TODAY! There are benefits to registering your Lifetime product. With our new online product registration form, it’s fast and easy! Register with us at www.lifetime.
BEFORE BEGINNING ASSEMBLY Keep the hardware bags and their contents separate. If any parts are missing, call our Customer Service Department. 3FBE UIF i$POHSBUVMBUJPOTw MFUUFS PO QBHF Identify and inventory all parts and hardware using the parts and hardware lists and identifiers in this document. *Two adults required to complete assembly* Only adults should set up the product. Do not allow children in the set-up area until assembly is complete.
ASSEMBLY GUIDES Refer to the following areas throughout the instructions to assist in the assembly process: This area is located at the top, left-hand corner of the page and indicates which tools and hardware are needed to complete the assembly steps on a page. TOOLS AND HARDWARE REQUIRED FOR THIS PAGE SEC This area is located at the top, right-hand corner of the page and shows an image of the product with shaded parts indicating which section is being assembled.
IMPORTANT NOTICES Level Surface Notice: Surface must be leveled before installation. We recommend building a level work space with a concrete or patio style surface. If the surface is not properly leveled, the Outdoor Shed will not assemble correctly. Proper surface leveling will save you time in the long run, so please do not ignore this step.
PARTS & HARDWARE LIST BOX 1 SHED PARTS BOX ID "(; "(0 "(' "() "(* "(3 "'9 AFV "(2 Description 3JHIU %PPS -FGU %PPS &OUSZ (BCMF 3FBS (BCMF 3FBS (BCMF 0VUFS 'MPPS 1BOFM $FOUFS 'MPPS 1BOFM 90” Shelf 3PPG 1BOFM ID Description BHC PEGBOARD STRIP INSTALLATION HARDWARE "%8 Y w 1BO )FBE 4DSFX BHD Tool Clip Assortment "*' w %PVCMF "SN )PPL "*( w %PVCMF "SN )PPL "*) + )PPL "** - )PPL "*+ 5PPMIPMEFS BHV GABLE ASSEMBLY HARDWARE (x2) "(1
PARTS IDENTIFIER BOX 1 SHED PARTS BOX Parts shown at 4% of actual size AGO (x1) Left Door AGZ (x1) Right Door AFV (x1) 90” Shelf (Rear View) AGF (x1) &OUSZ (BCMF AGH (x1) 3FBS (BCMF (Rear View) AGI (x1) 3FBS (BCMF (Rear View) AGR Y Outer Floor Panel AGQ (x8) Roof Panel AFX Y Center Floor Panel ! Note: Throughout the Parts & Hardware List, Part & Hardware Identifiers, and instructions are threeletter IDs.
PARTS IDENTIFIER BOX 1 METAL PARTS KIT [CTI] Parts shown at 8% of actual size 75 1/2” AFC Y Door End Channel 51” AFH Y 5SVTT (VUUFS $IBOOFM 59 1/2” AFE (x1) Entry Header Bar 48” AFG Y Roof Truss Brace 67 3/4” AFM Y Wall/Shelf Support Channel 79 1/2” CRD Y Door Hinge Tube METAL PARTS KIT [CTF] Parts shown at 8% of actual size 51” AFH (x4) 5SVTT (VUUFS $IBOOFM 10
PARTS IDENTIFIER BOX 2 SHED PARTS BOX Parts shown at 4% of actual size 105 104 AGY (x1) Corner Wall Panel 104 106 AGN (x1) Corner Wall Panel 105 AGW (x1) Corner Wall Panel 106 107 AGL (x1) Corner Wall Panel 107 AFY Y Center Roof Cap AHH (x1) Window Wall Panel AHD (x7) Wall Panel SMALL PARTS KIT [BDX] Parts shown at 4% of actual size Parts shown at 8% of actual size 116 115 SMALL PARTS BOX [BIA] Parts are not shown to scale AIW (x1) Wood Block AFZ (x6) Corner Shelf AHC (x4) Skylight AHE
PARTS & HARDWARE IDENTIFIER BOX 2 (CONT.
PARTS & HARDWARE IDENTIFIER BOX 2 (CONT.
PARTS & HARDWARE IDENTIFIER BOX 2 (CONT.
PARTS & HARDWARE IDENTIFIER BOX 2 (CONT.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE Concrete (1 cu. yd.) SEC SITE PREPARATION - CONCRETE PLATFORM PREPARATION 1.1 The actual dimensions of your shed (at its widest and longest points) are 8’ x 10’. Ensure you select a site that will accommodate these measurements. The base of the shed is slightly smaller than this, so you will need to DSFBUF B MFWFM TVSGBDF UIBU JT BU MFBTU w Y w 8F SFDPNNFOE VTJOH B MFWFM DFNFOU PS QBUJP TUZMF surface.
1 SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 1 2” x 4” x 118 1/4” Y /PU JODMVEFE 2” x 4” x 90 1/2” (x9) (Not included) 16d 3” Common Nail Y /PU JODMVEFE SEC ALTERNATIVE SITE PREPARATION: OPTION 1 - WOOD PLATFORM ASSEMBLY 1.2 &OTVSF BMM MVNCFS VTFE JT USFBUFE BOE BQQSPWFE GPS PVUEPPS VTF #VJME PVUTJEF GSBNF UP w Y w outside dimensions: Note: Whenever possible, you should use the surfaces described on Page 7.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 1 22 1/4” x 93 1/2” x 3/4” Treated Plywood (x1) (Not included) 48” x 93 1/2” x 3/4” Treated Plywood Y (Not included) SEC 1.3 8d 1 1/2” Common Nail Y (Not included) ALTERNATIVE SITE PREPARATION: OPTION 1 - WOOD PLATFORM ASSEMBLY (CONT) Square up the frame by measuring from corner to corner. Measurement A should equal Measurement B. B A ! Note: All lumber must be rated for outdoor use. SEC 1.4 Cut Plywood into sizes called for on previous page.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 1 2” x 4” x 120” Y /PU JODMVEFE 2” x 6” x 89” Y /PU JODMVEFE 8d 1 1/2” Common Nail (x16) (Not included) Pea Gravel (9.8 Cubic Feet) L-Bracket (x4) (Not included) (Not included) ALTERNATIVE SITE PREPARATION: OPTION 2 - FILLED WOOD FRAME ASSEMBLY SEC 1.5 Cut outside frame to 8’ x 10’ outside dimensions. Lay boards flat so widest parts face up. Ensure frame is level. Square up the frame by measuring from corner to corner.
SEC 2 FLOOR ASSEMBLY HARDWARE REQUIRED HARDWARE BAG REQUIRED: BQH Hardware shown at actual size BQC Y Y w 1BO )FBE 4DSFX 0OMZ VTFE ADC (x1) 1IJMMJQT #JU AHO Y Door Hinge Bushing LOCATED IN BOX 1 PLASTIC PARTS REQUIRED Parts shown at 4% of actual size AGR Y Outer Floor Panel AFX Y Center Floor Panel TOOLS REQUIRED Phillips Screwdriver HARDWARE BAG REQUIRED: BQH Safety Glasses ADC (x1) 1IJMMJQT #JU 20
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 2 NO HARDWARE REQUIRED FOR THIS STEP SEC FLOOR ASSEMBLY 2.1 Lay an Outer Floor Panel (AGR) flat on the ground. Hold a Center Floor Panel (AFX) at an angle as shown and fit tabs into slots. Lay Center Floor Panel flat. AFX AGR SEC 2.2 Hold the second Center Floor Panel (AFX) at an angle as shown and fit tabs into slots. Lay Center Floor Panel flat. AFX CAUTION Sharp objects may damage your floor.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE AHO Y SEC 2.3 Finally, connect the last Outer Floor Panel (AGR) to the second Center Floor Panel and lay flat. AGR SEC 2.4 %FDJEF XIJDI FOE XJMM CF UIF GSPOU PG ZPVS TIFE -JGU UIF 'MPPS 1BOFMT VQ FOPVHI UP TMJEF UIF UXP Door Hinge Bushings (AHO) under and up through the holes in the Floor Panels as shown.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 2 BQC Y 0OMZ VTFE SEC 2.5 'BDF UIF TFBN PG UIF UXP BEKBDFOU 'MPPS 1BOFMT *OTFSU UXP #8 x 1/2” Pan-Head Screws (BQC) near the seam of a Floor Panel and down into the tab of the adjacent Floor Panel at the locations shown. Repeat this step for both sides of each seam as shown. Insert Screws here. Seam Insert Screws here.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 2 IF YOU PLAN ON ANCHORING YOUR SHED, CHECK WITH YOUR LOCAL HARDWARE STORE FOR SUITABLE HARDWARE. SEC 2.6 ANCHORING THE SHED If you plan on anchoring your shed, you can anchor it to your platform through the four indentations near the corners of the floor. The anchoring hardware used depends on the platform.
SEC 3 TRUSS ASSEMBLY HARDWARE BAG REQUIRED: BEA (x3) HARDWARE REQUIRED Hardware shown at actual size (*Unless noted otherwise) ADY (x18) Y w 4DSFX ADJ (x6) 1/4” Cap Nut ADK (x18) $BQ /VU *AIP Y Truss Connector Part shown at 50% of actual size 12 11/16” ADH Y 1/4” Threaded Rod METAL PARTS KITS REQUIRED: CTF, CTI METAL PARTS REQUIRED Parts shown at 8% of actual size (*Unless indicated otherwise) 51” AFH (x6) 5SVTT (VUUFS $IBOOFM 48” AFG Y Roof Truss Brace TOOLS REQUIRED Phil
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 3/8” ADY Y ADK Y SEC TRUSS ASSEMBLY 3.1 Stand a Truss Gutter Channel (AFH) upright and set a Truss Connector (AIP) inside the end of the Channel as shown. Align the holes and secure with one (1) #10 x 3/8” Pan-Head Screw (ADY) and one (1) #10 Cap Nut (ADK). AIP AIP ADY ADK AFH 3.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 3 3/8” ADY Y ADK Y SEC 3.2 Connect another Truss Gutter Channel (AFH) to the Truss Connector using one (1) #10 x 3/8” Pan-Head Screw (ADY) and one (1) #10 Cap Nut (ADK). Notch AFH ADY 3.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 3 3/8” ADY Y ADK Y SEC 3.3 Lay the Truss Assembly on its side, and align the holes in a Roof Truss Brace (AFG) with those circled on the Truss (VUUFS $IBOOFMT BT TIPXO AFG SEC 3.4 4FDVSF UIF 3PPG 5SVTT #SBDF UP UIF 5SVTT (VUUFS $IBOOFM VTJOH UXP #10 x 3/8” Pan-Head Screws (ADY) BOE UXP #10 Cap Nuts (ADK). Repeat this step for the other end of the Roof Truss Brace. ADK ADY ADK WARNING ! Do not overtighten the Cap Nut.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 7/16” Y ADJ (x6) 12 11/16” ADH Y /PU UP TDBMF SEC 3.5 With the Truss Assembly on its side, slide a 1/4” Threaded Rod (ADH) through the Roof Truss Brace and Truss Connector as shown. Secure the top and bottom of the 1/4” Threaded Rod with a 1/4” Cap Nut (ADJ). Tighten all hardware. The 1/4” Threaded Rod will still spin freely. Set aside. Repeat this section for the second and third Truss Assemblies.
SEC 4 WALL PANEL INSTALLATION HARDWARE BAG REQUIRED: BHY HARDWARE REQUIRED Hardware shown at actual size ADZ (x58) 1/4” x 5/8” Pan-Head Screw (Not all screws will be used) PLASTIC PARTS REQUIRED LOCATED IN BOX 1 Part shown at 4% of actual size 104 AGY (x1) Corner Wall Panel 104 105 AGN (x1) Corner Wall Panel 105 AHD (x7) Wall Panel 106 AGW (x1) Corner Wall Panel 106 AGL (x1) Corner Wall Panel 107 AHH (x1) Window Wall Panel TOOLS REQUIRED Phillips Screwdriver 107 SMALL PARTS BOX REQUIRED:
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 4 ADZ Y AIW (x1) SEC WALL PANEL INSTALLATION 4.1 Fold Corner Wall Panel 105 (AGN). Fit tabs of Panel into the front, left corner of your Floor (while facing shed). Place a Wood Block (AIW) under the floor panel, directly under the first tab, then pull down on the Corner Wall Panel until the tab snaps into place. Move the Wood Block under the next tab and repeat.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADZ Y AIW (x1) SEC 4.3 Fold Corner Wall Panel 107 (AGL). Snap into place and fasten at the top hole with the required hardware. AGL AIW SEC 4.4 Insert two Wall Panels (AHD) along the back side of shed. Ensure the tops are level and the holes line up before fastening the Panels through the top holes using the required hardware.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADZ (x4) AIW (x1) SEC 4.5 Fold Corner Wall Panel 106 (AGW) and fasten it to the rear Wall Panel through the top hole using the required hardware. AGW AIW SEC 4.6 Snap three Wall Panels (AHD) into place along the right side of the shed. The Window Wall Panel may be inserted in any side Wall Panel position. Ensure the tops of the Wall Panels are even and the holes align.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADZ (x45) AIW (x1) SEC 4.7 Fold Corner Wall Panel 104 (AGY) and snap it into place at the right, front corner of the Floor as shown. Fasten it to the Wall Panel through the top hole using the required hardware. Finish fastening all Panels together with the rest of the 1/4” x 5/8” Pan-Head Screws (ADZ) for all holes.
SEC 5 LEFT DOOR ASSEMBLY HARDWARE REQUIRED HARDWARE BAG REQUIRED: BEF Hardware shown at actual size ADW Y Y w 1BO )FBE 4DSFX ABU Y w Y w $BSSJBHF #PMU 1BSU TIPXO BU PG BDUVBM TJ[F AHM Y Deadbolt Latch ADJ Y 1/4" Cap Nut AEE Y 'MBU 8BTIFS Part shown at 15% of actual size AIB (x1) Left Door Strike Plate AHZ (x1) Left Door Handle AIA (x1) Left Door Lock Bracket METAL PARTS KITS REQUIRED: CTI METAL PARTS REQUIRED Part shown at 8% of actual size 75 1/2” A
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE AHM Y SEC LEFT DOOR ASSEMBLY 5.1 Rest the Left Shed Door (AGO) with front side down. Slide a Door Hinge Tube (CRD) through the hole in the Door as shown. CRD AGO Back of Door SEC 5.2 Position the Deadbolt Latches (AHM) in the slots at the top and bottom of the Door, then slide the Door End Channel (AFC) onto the Door as shown.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 5 7/16” ABU Y AIB (x1) ADJ Y AIA (x1) SEC 5.3 Slip the Left Door Strike Plate (AIB) over the Left Shed Door and align the holes. AIB ! Note: You may need to nudge the Door End Channel to make these holes line up with the gap in the Door. SEC 5.4 Attach the Left Door Lock Bracket (AIA) to the Left Door Strike Plate with two 1/4” x 1 1/2” Carriage Bolts (ABU) and two 1/4” Cap Nuts (ADJ). ADJ WARNING AIA Do not overtighten the Cap Nut.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 5 ADW Y AEE Y SEC 5.5 Attach the Left Door Handle (AHZ) VTJOH UISFF #10 Flat Washers (AEE) BOE UISFF #10 x 3/4” Pan-Head Screws (ADW).
SEC 6 RIGHT DOOR ASSEMBLY HARDWARE BAG REQUIRED: BEG HARDWARE REQUIRED Hardware shown at actual size AEE (x5) 'MBU 8BTIFS 0OMZ BSF VTFE ABV Y Y $BSSJBHF #PMU AHY (x1) Latch Spring ADB Y w Y w 4UFFM 4QBDFS AHX (x1) Latch Cover Plate AIL (x1) Right Door Lock Bracket AIO (x1) Thumb Lever AHV (x1) Door Latch AEB Y 1/4” Flat Washer ADW (x4) Y 1BO )FBE 4DSFX 1BSU TIPXO BU PG BDUVBM TJ[F METAL PARTS REQUIRED AAB Y 1/4” Centerlock Nut Part shown at 15%
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE NO HARDWARE REQUIRED FOR THIS PAGE SEC 6.1 RIGHT DOOR ASSEMBLY Rest the Right Shed Door (AGZ) with front side down. Slide a Door Hinge Tube (CRD) through the hole in the Door as shown. CRD Back of Door AGZ SEC 6.2 Slide the Door End Channel (AFC) onto the Door as shown.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE NO HARDWARE REQUIRED FOR THIS PAGE SEC 6.3 Fit knobs of Thumb Lever (AIO) into the grooves of Right Door Handle (AIK). Groove Knob AIO AIK SEC 6.4 Rotate the Thumb Lever into the Right Door Handle. Slide forward until the knobs fit into the holes in the Handle.
7/16” ABV Y SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 6 ADW Y AEB Y AAB Y ADB Y AEE Y SEC 6.5 "UUBDI UIF 3JHIU )BOEMF "TTFNCMZ UP UIF %PPS VTJOH UISFF #10 Flat Washers (AEE) BOE UISFF #10 x 3/4” PanHead Screws (ADW). AIO AIK ADW AEE ADW AEE CAUTION Do not overtighten. Overtightening may damage parts and void warranty. SEC 6.6 Install Handle Latch assembly onto the Right Shed Door using the required hardware.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 6 AHY (x1) AHW (x1) ADW (x1) SEC 6.7 Line up the hole in the Latch Block (AHW) with the hole in the Thumb Lever and secure with one (1) #10 X 3/4” PanHead Screw (ADW). 8.7 ADW AHW Lip ! Note: The lip of the Latch Block (AHW) fits under the Thumb Lever (AIO). SEC 6.8 Attach Latch Spring (AHY) to the Door Latch (AHV) and the Latch Cover Plate (AHX). Set the Door aside.
SEC 7 GABLE ASSEMBLY HARDWARE REQUIRED HARDWARE BAG REQUIRED: BHV (x2) Hardware shown at actual size AEE (x10) Y w 'MBU 8BTIFS ADW (x10) Y w 1BO )FBE 4DSFX ADZ (x8) 1/4” x 5/8” Pan-Head Screw (Only 4 used) AHS (x4) End Plug 0OMZ VTFE ADV Y 1/4” x 1 1/8” Pan-Head Screw (Only 6 used) ACB Y Y w 1BO )FBE 4DSFX (Not used in this model) Parts shown at 8% of actual size AGP Y Louvered Vent AIQ Y Vent Screen METAL PARTS KITS REQUIRED: CTI METAL PARTS REQUIRED
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADZ (x4) SEC REAR GABLE ASSEMBLY 7.1 Lay the edge of Rear Gable 2 (AGI) over Rear Gable 1 (AGH) as shown, and align the four holes. AGI AGH SEC 7.2 $POOFDU 3FBS (BCMFT together using four (4) 1/4” x 5/8” Pan-Head Screws (ADZ) as shown. ADZ ADZ ! Note: Only use a hand screwdriver in this step.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 7 AEE (x5) ADW (x5) SEC 7.3 -BZ 3FBS (BCMF "TTFNCMZ n BU PO UIF HSPVOE PWFS UIF Vent Screen (AIQ) and Louvered Vent (AGP). Align the holes in UIF -PVWFSFE 7FOU XJUI UIPTF JO UIF 3FBS (BCMF "TTFNCMZ AIQ AGP SEC 7.4 "GUFS BMJHOJOH UIF IPMFT QSFTT EPXO m SNMZ PO UIF 3FBS (BCMF "TTFNCMZ XIJMF JOTFSUJOH UIF m WF #10 x 3/4” PanHead Screws (ADW) and the five (5) #10 x 1/2” Flat Washers (AEE).
ADW (x5) SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 7 AEE (x5) SEC ENTRY GABLE ASSEMBLY 7.5 Lay Entry Gable (AGF) flat on the ground over the Vent Screen (AIQ) and Louvered Vent (AGP) as shown. Align the holes JO UIF -PVWFSFE 7FOU XJUI UIPTF JO UIF &OUSZ (BCMF AGF AIQ AGP SEC 7.6 "GUFS BMJHOJOH UIF IPMFT QSFTT EPXO m SNMZ PO UIF &OUSZ (BCMF XIFO JOTFSUJOH UIF m WF #10 x 3/4” Pan-Head Screws (ADW) and the five (5) #10 x 1/2” Flat Washers (AEE).
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 7 ADV (x6) AHS Y SEC 7.7 Insert an End Plug (AHS) into each end of Entry Header Bar (AFE). AHS AFE The flat screw holes should face away from the Entry Gable. AHS The indented, rectangular hole faces downward, and is closer to the right side of the Entry Gable. ! Note: Only use a hand screwdriver in this step. SEC 7.8 "UUBDI UIF &OUSZ )FBEFS #BS UP UIF &OUSZ (BCMF "TTFNCMZ BOE TFDVSF XJUI TJY 1/4” x 1 1/8” Pan-Head Screws (ADV). Set aside.
SEC 8 DOOR & ENTRY GABLE INSTALLATION HARDWARE BAG REQUIRED: BHZ HARDWARE REQUIRED Hardware shown at actual size (*Unless noted otherwise) AHP Y Cotter Pin ADZ (x6) 1/4” x 5/8” Pan-Head Screw *AIM (x1) 3JHIU (BQ 'MBQ ADX (x4) Y w 1BO )FBE 4DSFX PLASTIC PARTS REQUIRED FROM SECTIONS 5, 6, & 7 Parts shown at 4% of actual size Rear View Entry Gable Assembly Left Door Assembly Right Door Assembly TOOLS REQUIRED Phillips Screwdriver Pliers *AIC (x1) -FGU (BQ 'MBQ Safety Glasses 49
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 8 AHP Y SEC 8.1 DOOR INSTALLATION Align the hole in the bottom of the Hinge of the Left Door Assembly with the hole in the Door Hinge Bushing on the Floor of your shed, and insert the Door Hinge Tube into the Door Hinge Bushing. Left Door Assembly SEC 8.2 Insert a Cotter Pin (AHP) through the Bushing and Door Hinge. Use a pair of pliers to bend the ends of the Cotter Pins outward. Repeat these steps for the Right Door Assembly.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADZ (x6) SEC 8.3 2 ADULTS REQUIRED FOR THE STEPS ON THIS PAGE ENTRY GABLE INSTALLATION Slide the two holes in the Entry Gable Assembly down over the Door Hinge Tubes as shown. SEC 8.4 "MJHO UIF IPMFT JO UIF TJEFT PG UIF &OUSZ (BCMF "TTFNCMZ XJUI UIPTF JO UIF UPQT PG UIF $PSOFS 8BMM 1BOFMT BOE secure with six (6) 1/4” x 5/8” Pan Head Screws (ADZ) at the locations indicated.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 8 ADX (x4) AIC (x1) (Not to scale) AIM (x1) (Not to scale) SEC 8.5 GAP FLAP INSTALLATION Attach the Right Left Gap Flaps (AIM AIC) to the top, right and left corners of the Doors as shown.
SEC 9 TRUSS, REAR GABLE, & ROOF INSTALLATION HARDWARE REQUIRED HARDWARE BAG REQUIRED: BHX Hardware shown at actual size (*Unless otherwise noted) ADZ Y 1/4” x 5/8” Pan-Head Screw (Not all screws will be used) ADX Y Y w 1BO )FBE 4DSFX AED Y Y w 'FOEFS 8BTIFS METAL PARTS REQUIRED AXX Y Truss Hole Insert SMALL PARTS KIT REQUIRED: BDX Parts shown at 8% of actual size AFL (x8) Roof Support Strip ! Note: The hole in the Roof Support Strip is for manufacturing purposes onl
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 9 NO HARDWARE REQUIRED FOR THIS STEP 3 ADULTS REQUIRED FOR STEPS 10.1 - 10.8 SEC TRUSS & ROOF INSTALLATION 9.1 Place the ends of a Truss Assembly into the notches on the Wall Panels as shown. While one adult holds the Truss Assembly in place, set a Roof Panel (AGQ) POUP UIF 5SVTT "TTFNCMZ BOE 'SPOU (BCMF 5IF FEHF PG UIF 3PPG 1BOFM fits down inside the Truss Channel.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE (Not actual size) 9 AFL Y ADZ Y SEC 9.3 8JUI UIF 3PPG 1BOFM JO QPTJUJPO CFUXFFO UIF (BCMF BOE 5SVTT TMJEF POF Roof Support Strip (AFL) into place within the notches of the Roof Panel. The bottom lip of the Roof Panel fits over the Wall Panel. The top of the Wall Panel fits into the groove near the bottom of the Roof Panel. AFL AFL ! Note: The holes in the Roof Support Strips are for manufacturing purposes only. Interior Upward View SEC 9.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE (Not actual size) AFL Y ADZ Y SEC 9.5 Place the ends of a second Truss Assembly into the notches on the next Wall Panel and Window Wall Panel as shown. SEC 9.6 While one adult holds the Truss Assembly in place, attach two more Roof Panels (AGQ) and Roof Support Strips (AFL) into the Truss Assemblies as shown. The edge of the Roof Panels fit down inside the Truss Channels.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 9 (Not actual size) AFL Y ADZ Y SEC 9.3 Place the ends of the last Truss Assembly into the notches on the next set of Wall Panels as shown. SEC 9.4 While one adult holds the Truss Assembly in place, attach two more Roof Panels (AGQ) and Roof Support Strips (AFL) into the Truss Assembly as shown. The edge of the Roof Panels fit down inside the Truss Channels. Ensure the alignment nubs in the Roof Panels fit into the notches on the Trusses.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 9 (Not actual size) AFL Y ADZ Y SEC 9.7 "UUBDI UIF 3FBS (BCMF "TTFNCMZ UP UIF TIFE BT TIPXO BOE TFDVSF XJUI GPVSUFFO 1/4” x 5/8” Pan-Head Screws (ADZ). Rear Gable Assembly SEC 9.8 Secure the last two Roof Panels (AGQ) POUP UIF 5SVTT BOE 3FBS (BCMF "TTFNCMJFT VTJOH UIF SFRVJSFE IBSEXBSF 5IF edge of the Roof Panels fit down inside the Truss Channels. Ensure the alignment nubs in the Roof Panels fit into notches on the Trusses.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 9 ADZ Y 2 ADULTS REQUIRED FOR STEP 10.9 - 10.10 SEC 11.9 SEC ROOF CAP INSTALLATION 9.9 Starting at the front side of your shed, attach the Front Roof Cap (AGG) UP UIF 3PPG 1BOFMT BOE &OUSZ (BCMF Continue moving to the rear attaching the Center Roof Caps (AFY). Finally, attach the Rear Roof Cap (AFW) to the Roof 1BOFMT BOE 3FBS (BCMF AFW ! Note: Use only a hand screwdriver for this step. AFY AFY AFY AGG SEC SEC 11.10 11.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADX Y AXX Y (Not to scale) SKYLIGHT INSTALLATION SEC SEC 9.11 11.12 ! AED Y Pre-fold Skylight (AHC) before installing. Push folded Skylight up through opening between Roof Caps; open Skylight; use tabs to pull Skylight down into place. Fasten Skylight in place with six (6) #10 x 1” Fender Washers (AED) and six (6) #10 x 1/2” Pan-Head Screws (ADX) (pull down on tabs while inserting screws to provide resistance).
SEC 10 SHELF INSTALLATION HARDWARE BAG REQUIRED: BHH, BHI (x6) HARDWARE REQUIRED Hardware shown at actual size Parts shown at 15% of actual size ADZ (x14) 1/4” x 5/8” Pan-Head Screw AIY Y Shelf Support Bracket Hardware shown at actual size ADZ Y 1/4” x 5/8” Pan-Head Screw METAL PARTS KIT REQUIRED: CTI METAL PARTS REQUIRED Parts shown at 8% of actual size 67 3/4” AFM Y Wall/Shelf Support Channel PLASTIC PARTS REQUIRED LOCATED IN BOX 1 & SMALL PARTS KIT: BDX Part shown at 4% of actual
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 10 ADZ (x8) SEC WALL/SHELF SUPPORT CHANNEL INSTALLATION 10.1 Insert a Shelf Support Channel (AFM) into the slots in the Wall Panels directly below the Right Truss notch, and secure with four (4) 1/4” x 5/8” Pan-Head Screws (ADZ). Insert a second Shelf Support Channel in the slot directly to the right of the Left Truss Notch and secure with four (4) 1/4” x 5/8” Pan-Head Screws. Insert Channels here.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 10 ADZ (x6) SEC 90” SHELF INSTALLATION 10.2 Set a Shelf Support Bracket (AIY) into the slots of each of the Shelf Support Channels. The slots must be at the same height. AIY AIY ! Note: Insert Shelf Support Bracket at an angle. SEC 10.3 Fold up flaps on the end of 90” Shelf (AFV). Set Shelf on Brackets with indentations toward wall, and secure with six (6) 1/4” x 5/8” Phillips Pan-Head Screws (ADZ).
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 10 ADZ Y SEC 10.4 CORNER SHELF INSTALLATION Fold up edges of a Corner Shelf (AFZ). Line-up holes in the Corner Shelf with a set of pre-made holes in any Corner Panel as shown. Secure with four (4) 1/4” x 5/8” Phillips Pan-Head Screws (ADZ). Repeat this step for the rest of the Corner Shelves. Holes Holes AFZ WARNING The total weight placed on a Corner Shelf cannot exceed 10 lb. (4.5 kg).
SEC 11 WINDOW INSTALLATION HARDWARE REQUIRED HARDWARE BAG REQUIRED: BEJ Hardware shown at actual size (*Unless indicated otherwise) ADZ (x4) 1/4” x 5/8” Pan-Head Screw *AIS Y Window Latch ADY (x1) Y w 1BO )FBE 4DSFX SMALL PARTS KIT REQUIRED: BDX PLASTIC PARTS REQUIRED Part shown at 4% of actual size AHE (x1) Window TOOLS REQUIRED Phillips Screwdriver Safety Glasses 65
ADZ (x4) SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 12 11 AIS Y (Not to scale) ADY (x1) SEC WINDOW INSTALLATION 11.1 Remove the plastic protective film from both sides of the Window (AHE) and slide the Window into the grooves along the sides of the opening in the Window Wall Panel (Fig. 1). Insert the #10 x 3/8” Pan-Head Screw (ADY) into the hole BU UIF CPUUPN PG UIF 8JOEPX 'JH VOUJM n VTI "UUBDI B Window Latch (AIS) above each corner of the Window as shown.
SEC 12 PEGBOARD STRIP INSTALLATION HARDWARE BAGS REQUIRED: BHC, BHD HARDWARE REQUIRED Hardware shown at actual size Hardware shown at 50% of actual size ADW (x10) w Y w 1BO )FBE 4DSFX AIJ Y Toolholder AIG (x1) 4” Double-Arm Hook AII Y L-Hook AIF (x1) w %PVCMF "SN )PPL AIH Y J-Hook SMALL PARTS BOX REQUIRED: BSI PLASTIC PARTS REQUIRED Parts shown at 15% of actual size AFU Y Pegboard Strip TOOLS REQUIRED Phillips Screwdriver Safety Glasses Level 67
ADW (x10) SEC PEGBOARD STRIP INSTALLATION 12.1 Using a level, position the Pegboard Strip (AFU) in any desired location along a Wall Panel wall. Screw the Pegboard Strip to the Wall using five (5) #10 x 3/4” Phillips Pan-Head Screws (ADW). See Note. Repeat this step for second Pegboard Strip. ! Note: The Pegboard Strip is screwed directly into the plastic. Line up the Strip anywhere on Wall so holes are over plastic (and not over a groove in the Wall).
SEC 13 FINAL STEPS HARDWARE REQUIRED HARDWARE BAG REQUIRED: BHB (x2) Hardware shown at actual size ADZ (x6) 1/4” x 5/8” Pan-Head Screw (Not all Screws are used) PLASTIC PARTS REQUIRED SMALL PARTS BOX REQUIRED: BSI Part not shown an any particular scale AYJ Y Battery-Powered Light TOOLS REQUIRED Phillips Screwdriver Rubber Mallet SMALL PARTS BOX REQUIRED: BSI AIX (x4) Wood Shim (Provided) Hammer 69 Safety Glasses
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE ADZ (x6) (Not all Screws are used) SEC BATTERY POWERED LIGHT INSTALLATION 13.1 Open the battery compartment and remove the plastic cap between the battery and the metal contact.
SEC TOOLS AND HARDWARE REQUIRED FOR THIS PAGE 13 NO HARDWARE PROVIDED FOR THIS STEP AIX (x4) SEC DOOR ALIGNMENT 13.2 In some cases, the shed doors may not completely line up at the tops (fig. 1).
CLEANING & CARE 12 Congratulations on your Lifetime® product purchase. By following the instructions below, your new Lifetime product should provide you with years of service and enjoyment. Cleaning and Care The polyethylene panels are stain- and solvent-resistant. Most stains can be removed, using a mild soap and a soft-bristled brush. Abrasive cleaning materials may scratch the plastic and are not recommended.
LIFETIME OUTDOOR SHED EQUIPMENT 10-YEAR LIMITED FACTORY WARRANTY THE MANUFACTURER RESERVES THE RIGHT TO MAKE SUBSTITUTIONS TO WARRANTY CLAIMS IF PARTS ARE UNAVAILABLE OR OBSOLETE. 1. Lifetime outdoor sheds are warranted to the original purchaser to be free from defects in material or workmanship GPS B QFSJPE PG UFO ZFBST GSPN UIF EBUF PG PSJHJOBM SFUBJM QVSDIBTF 5IF XPSE iEFGFDUTw JT EFm OFE BT JNQFSGFDUJPOT UIBU impair the use of the product.
ENHANCE YOUR LIFETIME® PURCHASE BY ADDING ACCESSORIES OR OTHER GREAT PRODUCTS To purchase accessories or other Lifetime Products, visit us at: www.lifetime.