Installation Guide

WATERPROOF WOOD
FLOORING INSTALLATION
Always check ooring planks for defects such as chips and color
variations under good light conditions. Check that groove are free of
debris. Use planks from multiple boxes during installation to insure
random pattern variation.
1. Read enclosed detailed installation instructions before beginning install.
2. A at suboor is a must!
3. Proper moisture testing is a must!
4. Proper expansion around all permanent structures is a must!
5. Molding, trim, transition, and nish pieces must not prevent the oor from oating.
6. Failure to follow installation instructions will void warranty.
7. No acclimation is required under proper conditions.
NO ACCLIMATION REQUIRED
No acclimation is required under proper conditions. However, if
the ooring is exposed to temperatures less than 40⁰ F (5⁰ C) or
more than 95⁰ F (35⁰ C) and/or if the ooring is exposed to relative
humidity below 35% or above 70%, ooring must be conditioned
by spreading them out in unopened cartons, not stacked, in the
room where they will be installed, for minimum 12 hours under the
recommended temperature and humidity ranges specied in this
installation guide.
The area in which the ooring is installed must remain *climate
controlled with the temperature between 65-85⁰F (18-25⁰C) for the
life of the product.
* Lofeproof’s Everlife SPC ooring may be installed in a vacation
home, three-seasons room, etc., with a temperature between 55-
95⁰ (13-35⁰C) at least 48-hours before and during the installation,
even if temporary temperatures must be taken. Thereafter,
the temperature cannot fall to below 40°F (5⁰C) or higher than
95⁰F (35°C) and RH must maintain between 35-70%. In these
installations, you must use transition moldings at doorways and
in any span greater than 40’ in any direction, as is true in light
comercial and radiant heat installations.
Installation spanning greater than 40 feet in length or width must
have a T-molding installed across the width of the room, archway or
at the beginning of the hallway to provide proper expansion space.
Doorways of less than 4 feet must always have a T-molding or other
transition molding regardless of oor length or width.
While this ooring can be installed above, on, or below grade, below
grade must not have a sump pump or oor drains.
This product is a oating oor and should NOT be secured to the
oor. Do not install xed objects, such as cabinets, on top of the
ooring unless it is fully adhered and do not fasten trim/molding/
transition pieces directly to the oor.
If existing baseboard molding is dicult to remove, Quarter Round molding likely will be required to cover the expansion space need
between ooring and baseboard.
Please Carefully Read All
Instructions Before You Begin
Your Installation.
Improper Installation
Will Void The Warranty.
WARNING: Drilling, sawing, sanding, or machining
wood products can expose you to wood dust, a
substance known to the state of California to cause
cancer. Avoid inhaling wood dust or use a dust mask
or other safeguards for personal protection. For more
information go to www.P65Warnings.ca.gov/wood
REQUIRED TOOLS AND SUPPLIES
1/2” spacers
Utility knife
• Straight edge ruler or T-square
• Pencil
• Tape measure
• Adhesive Tape
• Saw
Safety glasses
• Soft Rubber Mallet
• Dust Mask or Respirator

Summary of content (4 pages)