7x7 Installation Guide 2110mm 56mm 2124mm 50mm 130mm 4.
RECOMMENDATIONS Please read the components list BEFORE assembly, make sure that no parts are damaged or missing. Read through the complete assembly instructions again. Assemble all parts according to the instructions in this manual and do not skip any step. Treat the wall panels with extreme care before and during assembly. Carefully place them on the ground. Avoid stepping on or placing any objects on it. At least two people are required to assemble the garden sheds.
Garden Shed Three-view Drawing 2370 1964 2008 2222 2124 1875 1875 2222 2230 2124 2370 2124 123 56 2124 50 123 Tools Required for Installation Ø 8mm 3
Description QTY Code 1 Aluminum Bottom Frame (Front & Rear) 35x20 L=2124mm 4 M0707 35.2-30-2124 2 Aluminum Column (Left Front) 59x59 L=2222mm 1 Left front column M0707 59-59-2222 3 Aluminum Column (Right Front) 59x59 L=2222mm 1 Right front column M0707 59-59-2222 4 Aluminum Column (Left Rear) 59x59 L=2008mm 1 Left rear column M09707 59-59-2008 5 Aluminum Column (Right Rear) 59x59 L=2008mm 1 Right rear column M0707 59-59-2008 Aluminum Threshold 1 M0707 59.
No Structure Description QTY Code Double Door 18 19 20 A 1350X1830 WPC Plank Wall 170x20 L=1875 WPC Plank Wall 170x20 L=1964 Screws 1 28 12 8X80 18 B Screws 4X16 280 C Rivet 4X10 60 D E F Connector 50X50 Screws 5X20 Screws 5X45 6 12 45 G Screws 5X60 12 H Latch 2 I Hinge 4 J Plastic Cap for Aluminum Verge Board 4 K Door Lock Kit 1 5
Garden shed should be installed on the hard ground like concrete foundation, the surface of ground should be flat and the size should follow the dimension of drawing. 2200 2200 Bottom Beam Dimension Drawing.
A 1 1 1 16x A 1 Install aluminum bottom frames according to dimensions and positions as the sketch map shown above, then fix them with plastic expansion bolts. Please make sure the leveling of the bottom frames.
2 19 19 1 1 1 1 2 19 19 B Install the shed from the front side, please insert column(left & front) and WPC plank wall into the groove of aluminum bottom frames, then fasten column and planks with screws. Two operators are required for this step, one needs to hold the column so as to avoid any broken caused by tilt. (We suggest to install garden shed under the calm weather, and more operators are needed if install under windy weather.
2 Install the WPC plank wall one by one. 19 19 1 1 1 1 2 4 19 Install the column(left & rear) into place.
9 2 Install the WPC plank wall one by one. 4 19 1 1 1 1 4 2 9 20 19 1 1 1 1 Insert the aluminum H-shaped beam(left/right) into the column, then install WPC plank wall into the place one by one.
4 2 9 9 5 20 19 1 1 1 1 Install the aluminum column(right & rear) into the place, then insert the aluminum H-shaped beam(rear) into the column. 5 9 4 9 20 9 3 2 19 19 19 1 1 1 Install the aluminum column(right & front) into the place, then insert the aluminum H-shaped beam(left/right) into the column.
9 19 19 5 9 4 9 3 9 2 9 19 X2 19 X2 Install front WPC plank wall and aluminum H-shaped beam(front) into the place.
50mm 8 7 6 Insert the left and right aluminum door frames into the position, then install the aluminum threshold, and adjust perpendicularity and dimension between the two frames shown as the above sketch map. B After adjustment, please fix WPC plank wall, aluminum bottom frame and aluminum H-shaped beam with screws, two screws are required in the connection of every WPC plank wall and beams.
16 14 15 Install window into the place. (Please note different sides of window, the side with rivets should be toward the inside) Fasten the window with columns and H-shaped beams by using screws.
C 13 D 13 C 13 13 D Connect the aluminum beams with L brackets by applying rivets in advance. 13 13 13 13 Connect the aluminum beams with window (left & right side) by using rivets.
130mm 60mm G F 17 F F F E E E E E Install the color steel tile, the extension length of roof tile should be 60mm in the shed’s front side, while the left and right side should be 130mm. Please note that the length of screws for roof tiles fixing is different from those for the connection with aluminum beams.
17 17 Install roof tiles one by one, please pay attention to the connection method shown as the above sketch map.
J 10 J 11 12 J 11 12 10 J 12 10 J Install all aluminum verge boards in line with the diagram as above.
300mm 300mm 250mm 250mm Please install the door with following steps: - Assemble the hinge on the door with rivets(see diagram above); - Place the door in the position where needs to install it; - Put a subplate with a thickness of 5mm under the door; - Insert the other side of hinge into the place, and mark the position with a pencil; - Remove the door, then fix hinges with rivets.
H H Install the latch of door. Install the door lock.