ASSEMBLY INSTRUCTIONS ig FORBORE MEx 30mm (3), Spring Washer G95) and STEP 1.
A ME CMR Ah TURK PER Ra FLY STEP 2.12 Attach the Bed Rar! (5) 10 Headband Leg: i STEP 22: Tighten SCREW ony Headboard Beg bw using LESLEY ME) & repent the sane staph Foot board (17) STEP 23: Move the bed tu tie desired position, ; STEP 234: Inch the Drawer Sir (F) each to 2 Drawer Slat Suppressant fix with Drama Sta Support Stops (0). STEPS; Fix the Dave 81a0(F) to Bed Rail (Ey with CEH Mex Bim {2). 3 STEEP 2.6: Move T' Runner at Foot board (1) to Drawer Slat (0): TEP 2.
STET 4:1c Ana ch the Center Slat(R), Bed Slat io Bet Slat Support (3) Bennie with JOR M6 x -50mm {#4 by using L KEY M4 (7), STEP 2 Dachau Bed Slat (M) & Ded Sit (Ky and tighten Bed Rel (5) with CSI MA 1 35mm (25, ; : I's
} ASSEMBLY INSTRUCTIONS STEP 5:2: Close the distance Stat Cover (Mi) te Footballer (EB Tighten $1 STEP 4.0: Atishoo the Slat Cover (nD with CRE M4 18am £3, : topi Bed Slat (8: 1).