User Manual
Table Of Contents
- 15-0421 - Exhibit Cover.pdf
- Zenith User Guide 98-1723.pdf
- Gridstream Enhanced Cellular Overview
- Setting Up Command Center
- Meter Ordering and Customization
- Deploying Endpoints
- Managing Endpoints
- Scheduled Demand Reset
- Specifications
Draft
Chapter 4 - Deploying Endpoints Landis+Gyr
28 98-1723 Rev AB User Guide
Endpoint Status
The Endpoint Switch Command Status section will display all endpoints in the system and their
associated status. The endpoint status may be filtered by endpoint type. Available endpoint types
depend on the type of meters for which Command Center has been licensed.
Cellular meters support the following endpoint status values:
•Inventory: The cellular meter will transition to Inventory status during the following
scenarios:
• When a cellular meter is imported via the meter manufacturer file, the meter will
transition to Inventory status.
• A meter is removed from service
• A meter is removed from Archive
•Installed: The cellular meter will transition to Installed status during the following
scenarios:
• When a cellular meter is imported via the installation file, the meter will transition to
Installed status.
• Discovered. The cellular meter will transition to Discovered status during the following
scenarios:
• RF Registration is received
• Init Push is received
•Normal: The cellular meter will transition to Normal status during the following scenarios:
• Confirm Registration Response event is received during meter registration
• Configuration is complete
• Reconfiguration is complete
• Init Push event is received after meter program changed
• Sec Configure: The meter may transition to Sec Configure during the following scenarios:
• Security Configuration is received
• Any packet received
• Configure: When a read is processed and the packet’s last meter program date is different
than the value stored in Command Center, the meter will transition to Configure status. The
packet last meter program date will change when the meter program has changed. The meter
may transition to Configure during the following scenarios:
• Changed meter configuration group
• Meter program is changed
• HAN initialization
• CRC from Init Push does not match/Create new config
• Ping response is received
• Event is received from endpoint
• User chooses to reconfigure
• Failed: The meter may transition to Failed during the following scenario: