Install Instructions

Mascot FT, Heating Only, Boiler
Page 77
9.1 Quick View
Before Installing
- Make sure that there is enough space for
installing Water and gas line.
Verify vent/air termination is located as required.
- All models need for propane Conversion which
requires a separate gas conversion manual.
Install Water Piping
- Boiler loop piping must be sized to the minimums
listed in the Boiler manual. Using smaller piping
will cause performance problems.
Install Vent & Air Piping
- Slide the air inlet pipe and vent pipe into the
Boiler pipe connector.
- Make sure the terminations are placed as
required in the manual and that air intakes are at
least 12 inches above normal snow line.
- Refer to the material check list in this guide for a
list of items needed.
Install Condensate Piping / Tubing &
Components
- Fill out the material check list in this guide to
ensure you have the tubing or PVC pipe and all
components needed for the condensate piping.
- Connect internal components that are supplied
with the Boiler.
Install Gas Piping
- Install a union and shutoff valve.
Wire the Boiler
- Connect power wiring and control wiring per
boiler manual wiring diagram.(Section 4.19)
Start up, Adjust & Test
- Follow the Boiler manual instructions to clean
the system if needed, then ll and check water
chemistry.
9.2 Final Check Lists
Final check : Installation Conditions.
Is the Boiler properly mounted on the wall?
Is there space for a drain which is close to the
Boiler?
Are there any combustible materials near the
Boiler and vent pipe?
Is the air supply sufcient for proper operation of
the Boiler?
Are the proper service clearances maintained?
Is the distance between the Boiler and point of
vent termination minimized?
Is the proper distance from windows, doors, and
other intake vents maintained?
Final check : Gas pipe installation
Is the gas supply line equipped with a manual
shut off valve?
Is the gas supply line a minimum of 3/4˝ inner
diameter?
Is the gas supply line length and diameter
adequate to deliver the required BTU’s?
Has the gas supply line pressure been
measured?
Does the supply gas type match the type
indicated on the boiler rating plate?
Final check: Air/Vent pipe installation
Has the Boiler been vented with 3˝ or 2” PVC,
CPVC, Polypropylene or BH Special
Gas Vent (S636 PVC, CPVC) for Category IV
appliances in accordance with this manual and/or
your local code?
Is the vent termination at least 12˝ above the
exterior grade?
Is the total vent length within the maximum vent
length restriction?
Have you checked the air/vent piping for leaks?
Have you properly supported the vent
termination?
Are all vent runs properly supported?
Is the vent sloped upward toward the vent
termination at a rate of 1/4˝ per foot (2% grade)?
Final check : Condensate drain installation
Have you installed a condensate drain line from
the Boiler to a drain or laundry tub?
Final check : Setting the DIP switches
Are all DIP switches correctly set on the main
board?
SECTION 9. Installation Check