Install Instructions
Mascot FT, Wall Mounted, Combination Boiler
Page 75
9.2 Final Check Lists (continued)
Final check : Connecting the power supply
• Please check that the power is 120V AC.
• Have you checked the polarity of the electrical connection?
Final check : Pressure relief valve
• Have you installed an approved pressure relief valve on the boiler?
• Is the pressure relief valve of CH Plumbing at least 1˝ in diameter?
• Is the pressure relief valve of DHW Plumbing at least 3/4˝ in diameter?
• Have you installed the pressure relief valve on the hot water outlet pipe near the Boiler?
Final check : Burner ames
• The burner ame must be checked periodically for a constant proper blue color.
• If the ame does not appear normal, the burner may need to be cleaned.
• If the burner needs to be cleaned, it must be performed by a qualied service technician.
Sight Glass
Blue ame