Installation Instructions

Vinyl
Rainware
System
Brown
Clay
Khaki
Gray
Sandstone
White
HORIZONTAL COMPONENTS
Components Parts Description
Qty
Req.
K1
Gutter
10 ft. lengths. Gutter may be cut to fit
any size. Divide the total lineal feet of the
project by 10 to determine the number of
gutter pieces required.
K2
Left
End Cap
For capping the left open end of a
gutter. Also fits on drop outlet. Must be
cemented (A1) to the end of the gutter.
K3
Drop
Outlet for
Downspout
Allows for free thermal expansion
of gutter while providing outlet to
downspout. One required for each
downspout assembly. Do not cement.
Two (2) K31 screws required.
K4
Inside
Corner
For internal corner joining of gutter
sections. Must be cemented (A1) to the
end of the gutters.
K5
Hanger
Firmly supports gutter sections while
allowing for free expansion. One required
for every 24" of gutter. Do not cement.
Two (2) A2 screws required.
K6
Outside
Corner
For exterior corner joining of gutter
sections. Must be cemented (A1) to the
end of the gutters.
K7
Connector
For joining two gutter sections.
Must be cemented (A1) to the two
sections of gutters.
Vinyl Rainware System
Do it yourself Durable Easy to install
HORIZONTAL COMPONENTS
Components Parts Description
Qty
Req.
K8
Right
End Cap
For capping the right open end of a
gutter. Also fits on drop outlet.
Must be cemented (A1) to the end of
the gutter.
K9
Expansion
Connector
Must be used on any side where there
is 25 ft. or more between two corner
components and no drop outlet. Allows
for free expansion of gutter. Do not
cement. Two (2) K31 screws required.
K10
Leaf Guard
Keeps gutter free of leaves. Available in
5 ft. lengths.
K11
Wedge*
Used to adapt brackets and drop
outlet to inward slanted fascia. Will
compensate for roof pitches: 4/12 and
6/12. Do not cement. Must be used with
gutter bracket.
*SO - Special Order
Snap Together
Do-It Yourself
The K-Snap Leaf Guard is
the perfect complement to
your rainware installation.
It keeps leaves and large
debris out of your gutters.
manufactured by:
Snap Together - Do It Yourself
Durable - Easy to Install
STEP 1:
Install drop outlet (K3) at predetermined downspout location. Install a bracket (K5)
at highest point on fascia board at farthest point from drop outlet. Always slope
down to downspout location. Mark chalk line and position brackets every 24".
Slope should be 1/4" per 10 ft. End cap (K2 or K8) may be attached directly to
drop outlet if at end of a gutter run. If gutter continues around corner, position
brackets at same height and no closer than 12" from corner.
STEP 2:
Lightly sand surfaces to receive cement with 100 grit paper. Surfaces should be
clean and dry. Minimum temperature should be 32° F. Drying time of cement is
approximately 30 seconds. Use Plastmo cement only. Install end caps while still
on ground. Small guides will keep it in place while cement dries. For corners apply
cement in zig-zag pattern from front to back.
STEP 3:
Install gutter section with attached corner (K4 or K6) and/or end cap (K2 or K8)
onto brackets. Push rear edge of gutter up into bracket then snap front top of
gutter over front tip.
STEP 5:
Join gutter sections at roof level. Apply cement on cleaned connectors (K7) from
front to back. Hook connector onto rear edge of gutter, and then press connector
onto front of gutter so “Lock Rim” snaps into place.
STEP 7:
Make sure all cemented fittings are at
least 2" away from brackets.
Install elbow (D2) onto drop outlet. Measure downspout and cut to size between
elbows. Install third elbow at bottom of downspout using downspout bracket (D3)
as shown. Also install downspout bracket at top of downspout and at downspout
connector (if necessary).
STEP 8:
On particularly long runs you should
install an expansion connector (K9).
This is only needed when there is no
downspout, therefore, no drop outlet,
and a corner at either end of gutter run
and there is more than 25 ft. of gutter
between corners. See the instructions
included with unit.
STEP 4:
See temperature lines inside the drop outlet for proper placement of gutter.
Note: Do not cement gutter to drop outlet. Second side of corner can now be
cemented to clean surface of gutter. Engage gutter by pushing it up the back edge
of corner, then push front of gutter so that “Lock Rim” snaps into place.
Leaf Guard
Vinyl Rainware System
KSP-M15A ©2015 KP Building Products www.KPproducts.com
K2
Left End Cap
K3
Drop Outlet
D3
Downspout
Bracket
D4
Downspout
Connector
D1
Downspout
D2
Elbow 75°
K4
Inside Corner
K1
K-Snap Gutter
K5
Hanger
K6
Outside Corner
K7
Connector
K8
Right End Cap
Complete K-Snap Rainware System
VERTICAL COMPONENTS
Components Parts Description
Qty
Req.
D1
Downspout
10 ft. lengths. May be cut to size for use
between elbows. Generally one length
required for each story. Do not cement.
D2
Elbow
(75°)
Two are required for each downspout
assembly to bring downspout from
the fascia overhang to the wall. A third
may be used at base of downspout.
Do not cement.
D3
Downspout
Bracket
For securing downspout to the wall.
Use two for every length of downspout.
Do not cement. Two (2) K31 screws
required.
D4
Downspout
Connector
To join two lengths of downspout.
Also used for joining downspout to
drop outlet where there is no overhang.
Do not cement.
D5
Swing Up
Outlet
Installed at the base of the Downspout to
divert water from the building; swings up
for mowing, etc. Do not cement.
Each component is designed
and manufactured for durability
and ease of installation.
NOW AVAILABLE IN
VARIOUS COLORS.
ACCESSORIES
Components Parts Description
Qty
Req.
A1
Cement
(5 fl. oz.)
Use on surfaces to be permanently
“welded”. One tube required for every
100 ft. Use Plastmo cement only.
A2
Screws
#10 x 1 3/4"
20/bag
For mounting brackets, drop outlet
and expansion connector to building.
5/16" Hex and slot drive, plated.
K10