K-304-KS Installation Guide
7. Install the Finished Wall
Thin Wall
Twist the dome of the plaster guard to separate it from the outer
ring. Discard the outer ring.
Slide the dome over the valve stem.
NOTE: The plaster guard dome can be used as a guide for marking
the cutout.
Cuta4″ (102 mm) hole in the wall material.
For Valves with Stops: Using the holes in the valve backing plate
as a guide, cut openings for the stops.
Secure the wall material to the valve backing plate at the
locations shown.
Leave the plaster guard dome in place at this time.
2-3/4" (70 mm)
Wall
Material
Discard.
45˚
1-9/16" (40 mm)
1-9/16"
(40 mm)
Ø 4-1/2"
(114 mm)
Drywall
Screws
Ø 4"
(102 mm)
Kohler Co. 13 1110626-2-J