Installation Guide
3. Secure the Vanity
Wall-hung vanity: Using 2x4 lumber, create a temporary support
that is 14-3/4″ (375 mm) in height and spans the width of the
vanity.
With assistance, lift and place the vanity in position against the
finished wall.
Verify the vanity is level and plumb against the wall.
Wall-hung vanity: Place shims under the temporary support to
adjust the unit as needed.
Vanity with legs: Turn the leveler(s) to adjust the unit as needed.
Using a 1/4″ drill bit, drill pilot holes through the back rail and
the finished wall. Verify the pilot holes are positioned to ensure
the lag bolts will engage the 2x6 backing material or any studs.
Secure the vanity to the finished wall with two 5/16″ lag bolts
and washers (not provided).
If used, remove and discard the temporary support once the
vanity is properly installed.
Install optional accessories (shelves, drawers, other) as desired.
Refer to the instructions packed with the accessories.
Pilot Hole
Washer
Lag Bolt
Back Rail
Temporary Support
(For Wall-Hung)
Leveler
Kohler Co. 5 1216526-2-B