Installation Guide
2. Secure the Vanity
CAUTION: Risk of property damage. Select 250 lb (113.4
kg) load bearing 5/16″ lag bolts with a length to clear
obstacles in the wall and 5/16″ washers. Calculate proper lag
bolt length by adding the following: 1-1/2″ (38 mm) backing
material + wallboard thickness + back rail thickness.
CAUTION: Risk of product damage. Drill the lag bolt pilot holes
in the ends of the back rail to provide maximum support and to
prevent flexing of the unit.
With assistance, lift and place the vanity in position against the
finished wall. Do not drag the vanity into position.
Verify the vanity is level and plumb against the wall. If necessary,
place shims under the unit.
Using a 1/4″ drill bit, drill two pilot holes through the ends of
the back rail and the finished wall. Verify the pilot holes are
positioned in the back rail ends and ensure that the lag bolts will
engage the 2x6 backing material or any studs.
Secure the vanity to the wall with two 5/16″ lag bolts and
washers (not provided).
Install optional accessories (shelves, drawers, other) as desired.
Refer to the instructions packed with the accessories.
Pilot Hole
Shim
Washer
Lag Bolt
Back Rail
2x6 Bracing
Position lag bolts at ends of back rail
and secure into bracing.
1216534-2-C 4 Kohler Co.