Installation Guide
1. Preparation
Install the water supplies and drain pipes according to the
roughing-in information. Install the supply stops so the handles
will not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a
secure material for the anchoring devices.
Mark the centerline on the floor with a pencil.
Position the pedestal on the floor centerline location at the
required distance from the finished wall. Refer to the roughing-in
information for the required distance.
Carefully lift the lavatory into place on the pedestal. If necessary,
slowly move the pedestal to ensure proper fit.
NOTE: The lavatory must be supported by the pedestal.
Level the lavatory. If necessary, add additional self-adhesive
gaskets to achieve level.
Locate the two lavatory anchoring holes. Mark these anchoring
hole locations on the finished wall and mark the floor through the
hole in the pedestal bottom.
23-15/16" (60.8 cm)
1/2" (1.3 cm) D.
Mounting hole in
pedestal
10-1/4"
(26 cm)
13-13/16"
(35.1 cm)
8" (20.3 cm)
11-1/8"
(28.3 cm)
2-5/8" (6.7 cm)
9-1/2" (24.1 cm)
35-1/4"
(89.5 cm)
7-1/2"
(19.1 cm)
Finished Floor
2-5/8"
(6.7 cm)
7-15/16"
(20.2 cm)
3/8" Cold
1-1/2"
(3.8 cm)
20-7/16"
(51.9 cm)
4" (10.2 cm)
K-2359-4
4" (10.2 cm)
1-1/4" OD
Finished
Wall
K-2359-8
3/8"
Hot
Kohler Co. 3 1063452-2-B