Installation Guide
Before You Begin (cont.)
Determine the location of the control amplifier if it will be installed remotely. The control amplifier
includes a 25’ (7.6 m) cable.
A qualified electrician should install a 120 V, 15 A (240 V, 15 A in Latin America) GFCI or RCD
electrical outlet within the stud framing and within 24″ (610 mm) of the control amplifier. The user
interface, transducers, and (if equipped) chromatherapy are powered through connections with the
control amplifier.
Use conduit to route the electrical power wires from the circuit breaker.
Choose the location for a battery operated auxiliary audio device, if used. Do not locate devices
using AC power within reach of the bath.
Carefully plan moving the bath into the installation area. This bath will not easily fit through
doorways.
Carefully uncrate the new bath and components and inspect for damage. Make sure there is no
damage to the bath. If there is a problem, do not install the bath. Report the specific problem to
your dealer immediately.
After inspection, return the bath and components to the carton until you are ready to install the
product.
Provide access to the control amplifier connections for future servicing.
To ensure a successful bath installation, the floor must be level.
Provide adequate floor support.
Provide properly-dimensioned framing.
The basin area requires no additional support when the subfloor is level and square with the stud
framing. Consider using shims for additional support if the subfloor is uneven.
Do not select a rim-mount faucet for this bath. Instead, select a deck-mount or wall-mount faucet.
Plan for adequate mounting and connection space for the faucet.
Verify adequate support for the faucet. Large deck-mount faucets are not appropriate or safe for this
installation.
This bath conforms to CSA B45.5/IAPMO Z124. All dimensions are nominal.
Kohler Co. 3 1181167-2-E