Installation Sheet
1. Prepare the Site
NOTICE: Measure your actual product for site preparation. Note the model number located on the
pump/blower end of the bath, then visit the product page at kohler.com for more information.
NOTICE: Drop-in models are not intended for alcove installation. Use a flanged model for alcove areas.
NOTICE: Provide adequate ventilation and a minimum 32
cubic
feet
(.9 cubic meters) of air space in the
installed
location
for cooling the motor and to supply sufficient air for the blower. Do not install the
blower motor closer than 1″ (25 mm) from the wall or other objects.
NOTICE: Provide generous, unrestricted access to the pump and blower. Refer to the Product
Specification Sheet for minimum access panel requirements. You must provide access immediately next
to the pump, blower, and controls for servicing.
NOTICE: Do not support the weight of the bath by the rim. Plan to shim under the bath as needed when
leveling the bath.
NOTE: Drop-in or alcove installation is possible, depending on the product chosen.
Carefully unpack and inspect the new bath for damage before installation. If there is damage do not
install the bath; contact your dealer.
Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and
level.
Construct 2x4 stud framing.
Install an access panel on the pump/blower end of the bath for servicing. The access panel must be
at least 30″ (762 mm) wide by 15″ (381 mm) high.
Install the rough plumbing.
Install the drain to the bath according to the drain manufacturer’s instructions.
Protect the bath surface by positioning a clean drop cloth in the bowl bottom.
Access
Panel
Construct according
to the product dimensions.
Construct 2x4
stud framing
according to the
product dimensions.
Position the
rough plumbing.
Verify that the subfloor
offers adequate support,
and is flat and level.
Alcove Drop-In
Position the
rough plumbing.
Verify that the subfloor
offers adequate support,
and is flat and level.
1385107-2-B 4 Kohler Co.