Install the Bath (cont.)
Nail 1/4″ (6 mm) thick furring strips to the studs.
Insert the drain tailpiece into the trap. Secure the drain tailpiece to the trap.
Install the faucet valve.
Check the drain connections for leakage.
1208027-2-F 6 Kohler Co.