Installation Guide

Tools and Materials
Before You Begin
NOTICE: Adequate floor support must be provided. Note the model number on the back of the bath,
then visit the product page at www.kohler.com for additional information.
NOTICE: Do not support the load weight of the bath by the rim.
NOTICE: Verify adequate support if installing a rim- or deck-mount faucet. Large faucets that may be
inadvertently used as a means of support are not safe for this installation.
Read these instructions and determine the locations of all required components before beginning
installation.
Provide access to the control amplifier and control board connections for servicing.
This bath is designed for three side alcove installation.
The control amplifier may be installed remotely and includes a 25’ (7.6 m) cable.
Use conduit to route electrical wires from the circuit breaker.
Choose the location for a battery operated auxiliary audio device, if used. Do not locate AC
powered devices within reach of the bath.
Carefully plan moving the bath into the installation area. This bath will not easily fit through
doorways.
Inspect the bath and components before beginning installation. If there is damage, do not install the
bath; contact your dealer.
Install this bath on a level subfloor. Shims may be needed if the subfloor is uneven.
This bath conforms to CSA B45.5/IAPMO Z124. All dimensions are nominal.
• Conventional woodworking tools and materials
• 2x4s
• Conduit
• Drop cloth
• Mortar cement (Optional)
• Construction adhesive (Optional)
• Felt Strips
Plus:
#1 and #2
Tin Snips
100% Silicone Sealant
Kohler Co. 3 1212244-2-B