Liquid Cooled Vertical Crankshaft Service Manual
11.23
Section 11
Reassembly
11
8. Lift the by-pass hose and secure it within the
metal clip under the main support bracket. See
Figure 11-78.
Figure 11-78. Seating By-pass Hose.
Install Electric Starter
1. Position the starter mounting plate onto the
crankcase so that the cutout is at the bottom,
and the offset is toward the dipstick tube. Install
and torque the two hex. flange mounting screws
to 15.3 N·m (135 in. lb.). See Figure 11-79.
Figure 11-79. Torquing Adapter Plate Screws.
2. Mount the electric starter to the plate and start
the two mounting bolts into the crankcase. The
lifting bracket must be on the bolt closest to the
solenoid, and should extend down and out.
3. Slide the adjacent radiator support bracket under
the heads of the starter bolts and behind the
lifting bracket. Check that the starter is square to
the crankcase, then torque the mounting bolts to
15.3 N·m (135 in. lb.). See Figure 11-80.
Figure 11-80. Torquing Starter Mounting Bolts.
4. Attach the leads to the solenoid and starter.
5. Push down on the lower tube/hose assembly
and securely tighten the metal tie strap around
the lower tube/hose assembly using a pliers.
Make sure the head of tie strap is below the top
of the tube where it will not be contacted by the
flywheel. Cut off all excess strap material. See
Figure 11-81.
Figure 11-81. Tightening Tie Strap with Pliers.