Installation Guide
1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles
will not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a
secure material for the anchoring devices.
Mark the centerline on the floor.
Refer to the roughing-in information, and position the pedestal on
the floor centerline location at the required distance from the
finished wall.
Carefully lift the lavatory into place on the pedestal, and slowly
move the pedestal as required to ensure proper fit in the desired
location.
NOTE: The lavatory must be supported by the pedestal.
Level the lavatory, and add additional self-adhesive gaskets as
needed to level.
K-2338-8
2-7/16" (6.2 cm)
8-1/2"
(21.6 cm)
15-1/4"
(38.7 cm)
3-1/16"
(7.8 cm)
12-1/16"
(30.6 cm)
9-1/2"
(24.1 cm)
Finished Floor
1-1/4" Outlet
3/8" Cold
3/8" Hot
4" (10.2 cm)
4" (10.2 cm)
17" (43.2 cm)
C
L of Backing
24" (61 cm)
11"
(27.9 cm)
9"
(22.9 cm)
Kohler Co. 3 1033753-2-A