Installation Guide

6. Prepare the Site Deck-Mount
NOTE: Provide an access panel under the bath deck for water
supply connections.
NOTE: Reference the Rough-In Deck-Mount section of this
guide before proceeding.
Position the support plate on the bath deck where the water
supply tubing will be located. Trace the holes.
Verify that the location of the plate will allow the bath filler spout
to reach into the bath.
Verify the distance between the centerline of the marked holes is
5-15/16” (151 mm).
NOTE: If a hole saw will be used, drill outside the line of the
marked holes.
Drill the holes using a 1-9/16” drill bit or 1-1/2 hole saw.
Remove any debris after drilling.
Verify the drilled holes will accommodate the riser tubes. Adjust
the hole diameter slightly, if needed.
Secure the support plate to the unfinished bath deck with the
eight (provided) wood screws.
Bath Deck
Screw
5-15/16"
(151 mm)
Support Plate
Check the reach.
1219580-2-A 10 Kohler Co.