INSTALLATION GUIDE AVAILABLE AT
BEFORE YOU BEGIN INSTALLATION VERIFYING YOUR ORDER Verify that all hardware, shelves, closet uprights, fronts, moulding and accessories you purchased are on site. A missing item could delay the project. ORGANIZING YOUR ORDER Your KLËARVŪE CLOSETS ™ order may consist of closet uprights, hinges, drawer kits, hardware, shelves, door and drawer fronts, cover panels, and other finishing items.
PREPARATION 1 Closets fit best on square walls. Walls that are out of square will require modification to ensure closet installation goes smoothly. For proper closet operation and overall appearance, it is essential for the closet to be mounted level, plumb, and square in relationship to the floor and walls. If there is any unevenness, your closet uprights must be shimmed and adjusted for proper function. 4 Snap a chalk line or draw a level line at 84-3/4" from the highest point of your finished floor.
2 Align the cam locks (included in the cam lock pack from the shelf kit) into the shelves, making sure the open ends match up. Firmly press the cam locks into the holes. 4 Once all shelves have been installed in your closet base, verify it is square and plumb. Secure the closet using an L-bracket (478-5050) into a wall stud and on top of the top shelf, so the bracket is out of sight. Note: Cam locks cannot be removed once installed, ensure proper installation.
CLOSET UPRIGHTS 6 Once cabinet connector installation locations have been determined, insert cabinet connectors and fasten using a Phillips head screwdriver until tight. We suggest using cabinet connectors in each corner of the uprights. Once the connectors are installed, remove clamps. Note: If cover panel is required between closet bases, cabinet connectors will not be needed.
COVER PANELS, MOULDING AND TOE KICKS COVER PANELS 1 Exposed ends of closet uprights have the option to be finished with a cover panel. Place cover panel to the upright, lining up to be flush to the top of the upright, and 3/4" past the front of the upright. Fasten with the included screws through the pre-drilled holes of the upright into the cover panel. More step-by-step installation instructions are included with the cover panel. Note: Cover panels will be longer than your closet uprights.
SHELF & DRAWER LOCATIONS CAM LOCK DOWEL LOCATIONS CAM LOCK SHELF LOCATIONS 1 14" depth uprights and shelves will require cam dowels to be installed in the front column of holes and back coulmn of holes. 1 All shelves will be installed in the top row of holes on the upright. Other configurations will require the 33rd row from the top and last row (65th) for a center and bottom shelf.
DRAWER LOCATIONS DRAWER LOCATIONS - 3 DRAWER BANK This configuration is made from Medium Drawer Kits. Follow step-by-step instructions with your drawer kit. Refer to this layout for glide installation location. DRAWER LOCATIONS - 2 DRAWER BANK This configuration is made from Tall (High) Drawer Kits. Follow step-by-step instructions with your drawer kit. Refer to this layout for glide installation location. Note: There is no bottom shelf installed with drawer banks.