Owner manual

24
B. Deburring
Useaknife,plasticpipedeburringtool,orletoremoveburrsfromthe
endofsmalldiameterpipe.Besuretoremoveallburrsfromaroundthe
insideaswellastheoutsideofthepipe.Aslightchamfer(bevel)ofabout
10°-15°shouldbeaddedtotheendtopermiteasierinsertionofthepipe
intotheendofthetting.Failuretochamfertheedgeofthepipemay
removecementfromthettingsocket,causingthejointtoleak.
STEP B
C. Test dry t of the joint
Taperedttingsocketsaredesignedsothataninterfacedtshould
occurwhenthepipeisinsertedabout1/3to2/3ofthewayintothe
socket.Occasionally,whenpipettingdimensionsareatthetolerance
extremes,itwillbepossibletofullyinsertdrypipetothebottomof
thettingsocket.Whenthishappens,asufcientquantityofcement
mustbeappliedtothejointtollthegapbetweenthepipeandtting.
Thegapmustbelledtoobtainastrong,leak-freejoint.
D. Inspection, cleaning, priming
Visuallyinspecttheinsideofthepipeandttingsocketsandremove
alldirt,greaseormoisturewithacleandryrag.Ifwipingfailstoclean
thesurfaces,achemicalcleanermustbeused.Checkforpossible
damagesuchassplitsorcracksandreplaceifnecessary.
Depth-of-entry
Markingthedepthofentryisawaytocheckifthepipehasreached
thebottomofthettingsocketinStepF.Measurethettingdepth
andmarkthisdistanceonthepipeO.D.Youmaywanttoadd
severalinchestothedistanceandmakeasecondmarkasthe
primerandcementwillmostlikelydestroyyourrstone.
Applyprimertothesurfaceofthepipeandttingsocketwith
anaturalbristlebrush.Thisprocesssoftensandpreparesthe
PVCorCPVCforthesolventcementingstep.Movequicklyand
withouthesitationtothecementingprocedurewhilethesurfaces
arestillwetwithprimer.
E. Application of solvent cement
• Applythesolventcementevenlyandquicklyaroundoutsideofthe
pipeatawidthalittlegreaterthanthedepthofthettingsocket.
• Applyalightcoatofcementevenlyaroundtheinsideofthe
ttingsocket.Avoidpuddling.
• Applyasecondcoatofcementtothepipeend.
STEP E
F. Joint assembly
Workingquickly,insertthepipeintothettingsocketbottomand
givethepipeorttinga1/4turntoevenlydistributethecement.
Donotcontinuetorotatethepipeafterithashitthebottomofthe
ttingsocket.Agoodjointwillhavesufcientcementtomakea
beadallthewayaroundtheoutsideofthettinghub.Thetting
willhaveatendencytoslidebackwhilethecementisstillwet
soholdthejointtogetherforabout15seconds.
STEP F
G. Cleanup and joint movement
Removeallexcesscementfromaroundthepipeandttingwitha
drycottonrag.Thismustbedonewhilethecementisstillsoft.
Thejointshouldnotbedisturbedimmediatelyafterthecementing
procedure,andsufcienttimeshouldbeallowedforpropercuring
ofthe joint. Exactdrying timeis difcultto predict becauseit
dependsonvariablessuchastemperature,humidityandcement
integrity.Formorespecicinformation,youshouldcontactyour
solventcementmanufacturer.
STEP G