Instructions / Assembly

8
INSTALL DOOR - CONTINUED
6
INSTALL HARDWARE - CONTINUED
1. Remove hardware from bag. Match the hardware boxes to names on
the schematic. Arrange hardware so that it matches the hardware
layout within the schematic.
2. To avoid damage to the rollers, clean all debris from the head and
sill track.
3. Locate the cut out
near the end of the
sill track and insert
the properly handed
Directional Carrier
Set (two wheel) and/
or Intermediate
Carrier Set (one or
both dependent
upon conguration).
Carriers should be
positioned so that the
tapered wheels face
towards the interior
and the horizontal
wheels face towards
the exterior.
4. Insert the properly
handed pivot hinge.
Hinge should be
inserted so that the
heel, with the two
screw holes, is towards
the interior of the sill
track. Slide all the way
against jamb.
Secure the lower pivot
hinge to sill track with
two #6 x 1" screws.
Apply the aluminum
sill cover plate on top
of the lower pivot
hinge and secure with
two #8 x 3/8" screws.
5. Locate the cut out
near the end of the
head track and insert
the proper upper track
guide (as paired in the
box with the lower
track carrier set).
6. Install the properly
handed upper pivot
hinge. Align the metal
hinge plate with the
plastic housing and
secure the hinge to
upper track with four
#6 x 1" screws.
7. Press the weatherstrip
back into the
headtrack.
Cutout
Sill cover
plate
Cutout
Weatherstrip
Upper
track pivot
guide
Upper
pivot
hinge
Weatherstrip
Head
Exterior
Exterior
Exterior
Exterior
Four Wheel
Carrier set
shown
Pivot hinge
Sill
ASSEMBLY AND INSTALLATION INSTRUCTIONS
for W-4500 Folding Door Systems (JII041)