Instructions / Assembly

INSTALLATION INSTRUCTIONS
for Pre-Hung Exterior Entry Doors (JII106)
2
FULLY SHEATHED WALL CONSTRUCTION
The wall framing is
covered by sheathing
and the door will be
mounted with the
exterior trim ush
against the sheathing.
This installation
assumes building wrap
is properly installed
prior to installation.
OPEN-STUD CONSTRUCTION
The wall framing needs to be completely surrounded by backing
support (non water-degradable, thin (max. 1/8" thick) sheet material
such as plywood or lauan) before installing building wrap and the
door. The door will be mounted with the exterior trim ush against the
applied backing support.
This installation guide specically addresses masonry/block wall,
sheathed wall and open-stud construction.
MASONRY/BLOCK WALL CONSTRUCTION
This installation
assumes that a
building professional
has already properly
fastened and sealed
a framework of studs
(often called a buck)
to the concrete/
masonry wall.
ROUGH OPENINGS
Buck
Trimmer
studs
Header
Sheathing
Sill area
King
stud
MATERIALS
•Lockset
•10dgalvanizedcasingornishingnails(ifplantostain)or#8x3"and
#10x21/4"drywallscrews(ifplantopaint)
•Non-compressibleorwaterdegradableshims
•Sealant(polyurethaneifpainted,100%siliconeifleftexposed)and
backer rod
•Closedcellpolyurethane low expansion foam (Dow Great Stuff
Window and Door or equivalent)
•Sheetmetalashingorbendablevinylsheetingforsillpan
•Plasticdrainscreenwithcrisscrossorwovenpattern(soldin6"widths
to protect rain gutters) for step-down landings
•3/8"staplesforstep-downlandings
NEEDED MATERIALS & TOOLS
For installations into a Buck:
Liquidappliedashing(ProtectoWrapLWM200orequivalent)
For installations into a stud-framed wall:
•ProtectoWrapSafsealSystems5500sprayadhesive/primer(oras
recommended by the self-adhesive ashing manufacturer)
•JELD-WEN6"wideself-adhesiveashing(part#08987)orequivalent
(9"ifrequiredbylocalcode)
•Dripcapifrequiredbecauseofdoorlocationandexposure.Doors
with an adequate overhang (see our Appropriate Protection
document at www.jeld-wen.com/learn/resources/care-maintenance)
may not need a drip cap.
Note! Follow all material manufacturers’ instructions for proper use
and compatibility.
SAFETY & HANDLING
SAFETY
•ReadandfullyunderstandALLmanufacturers’instructionsbefore
beginning. Failure to follow proper installation and nishing
instructions may result in the denial of warranty claims for
operational performance problems.
•Donotworkalone.Twoormorepeoplearerequired.Usesafelifting
techniques.
•Usecautionwhenhandlingglass.Brokenorcrackedglasscancause
serious injury.
•Wearprotectivegear(e.g.safetyglasses,gloves,earprotection,etc.).
•Operatehand/powertoolssafelyandfollowmanufacturer’soperating
instructions.
•Usecautionwhenworkingatelevatedheights.
MATERIALS & DOOR HANDLING
•Makesuretheoperatingpanelissecuredpriortoinstallation.
•Heedmaterialmanufacturer’shandlingandapplicationinstructions.
•Protectadhesivesurfacesfromdirt,moisture,directsunlightand
folding over onto themselves.
•Handleinverticalposition;donotdragonoor.
•Donotputstressonjoints,cornersorframes.
•Storedoorindry,well-ventilatedareainvertical,leaningpositionto
allowaircirculation;donotstackhorizontally.
•Protectfromexposuretodirectsunlightduringstorage.
•Installonlyintoverticalwallsandwhenconditionsandsheathingare
dry.
IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!