COMPLETE INSTALLATION
8
1. Release the building
wrap from above the
header (previously
taped up) and overlap
the header ashing.
Seal the ends with
self-adhesive ashing
or building wrap tape.
2. Seal all four corners
of the window with a
3/8" bead of sealant.
Tool into a llet shape.
3. Seal any gaps or
openings at end of
horizontal mull joints
with sealant.
4. Create a continuous
air seal on the
interior between the
rough opening and
the window frame
with low expansion
polyurethane foam or backer rod and sealant.
AFTER INSTALLATION
• Install exterior wall surface within 30 days of window installation.
• Maintain gap of 1/4"- 3/8" between window frame and nal exterior
wall surface.
• Adjust window for best operation.
• Remove protective lm from cladding (if present) immediately after
installation; remove from glass within one year.
• Protect recently installed units from damage from plaster, paint, etc.
by covering the unit with plastic.
• Finish all exposed wood surfaces immediately following installation.
Please visit jeld-wen.com for warranty and care
and maintenance information.
Thank you for choosing
(05/14)
©2014 JELD-WEN, inc.; This publication and its contents are owned by JELD-WEN, inc. and are protected under the U.S. Copyright Act and other intellectual
property laws. All trademarks, service marks, logos and the like (whether registered or unregistered) are owned or controlled by JELD-WEN, inc. or others.
Unauthorized use or duplication of JELD-WEN intellectual property is prohibited.
JELD-WEN reserves the right to change product specications without notice. Please check our web site, jeld-wen.com, for current information.
Continuous
air seal
Continuous
Shim
Flashing
Rough
opening
Back of
ashing
Sill