Instructions / Assembly
INSTALLATION INSTRUCTIONS
for Vinyl Windows with Integral Nailing Fin (JII001)
6
COMPLETE INSTALLATION
7
1. Release the building wrap
from above the header
(previously taped up)
and overlap the header
ashing. Seal the ends with
self-adhesive ashing or
building wrap tape.
2. Adjust window for best
operation.
3.Sealthetopcornersofthe
windowwitha1/4"bead
of sealant. Tool into a llet
shape.
4.Createacontinuousairsealontheinteriorbyintegratingtherough
opening and the window frame with low expansion polyurethane
foam or backer rod and sealant. If installing into wood framing with
a drain mat, apply sealant to the foam wedge on the back of the
drain mat, integrating the back of the drain mat with the window
frame.
5.Ensureweepholes/channelsareclearofdebrisforproperwater
drainage. Do not seal weep holes/channels.
AFTER INSTALLATION
•Installexteriorwallsurfacewithin30daysofwindowinstallation.
•Maintaingapof1/4"-3/8"betweenwindowframeandnalexterior
wall surface. No expansion/contraction joint is needed for integral
J-channel windows installed into a structure with aluminum or vinyl
siding.
•Protectrecentlyinstalledunitsfromdamagefromplaster,paint,etc.
by covering the unit with plastic.
Please visit jeld-wen.com/resources for warranty
and care and maintenance information.
Thank you for choosing
© 2008 JELD-WEN, inc. | JELD-WEN and Reliability for real life are registered trademarks of JELD-WEN, inc., Oregon USA.
All other trademarks are the property of their respective owners.
(12/08)
Sealant