Instructions / Assembly
INSTALLATION INSTRUCTIONS
for Interior Door Slabs (JII110)
2
than the slab and
There should be
enough distance
between the jamb
edge and the stop
to accommodate the
thickness of the slab.
jamb is square.
measurements
should be the same.
deviation from
2
A
D
C
E
Verify Square, Level, & Plumb
Do not install the slab unless the jamb meets the above conditions.
Professional assistance may be necessary to correct any problems before
installation.
or pads.
1
If any of the above conditions represent a concern, do not install the
slab. Contact the supplier for recommendations.
MATERIALS
Note! Follow all material manufacturers’ instructions for proper use
and compatibility.
NEEDED MATERIALS AND TOOLS
TOOLS
roller, spray equipment, masking
3
IMPORTANT: The door slab should be nished (painted or stained) on
all six sides with an equal number of coats after all routing, trimming,
boring and touch-up has been completed and it has been properly t
in the jamb. Failure to nish on all six sides and install into a square,
level and plumb condition could result in denial of warranty claims for
operational or performance problems. See our nishing document at
www.jeld-wen.com/resources for nishing requirements and details.
PREPARE JAMBS AND SLAB
from side to side in several places to verify the slab will t. The frame
the slab to operate without rubbing on any ooring.
Frame
Stop