Instructions / Assembly

INSTALLATION INSTRUCTIONS
for Interior Door Slabs (JII110)
2


than the slab and

There should be
enough distance
between the jamb
edge and the stop
to accommodate the
thickness of the slab.

jamb is square.

measurements
should be the same.

deviation from

2

A
D
C
E
Verify Square, Level, & Plumb






Do not install the slab unless the jamb meets the above conditions.
Professional assistance may be necessary to correct any problems before
installation.

or pads.

1


If any of the above conditions represent a concern, do not install the
slab. Contact the supplier for recommendations.
MATERIALS








Note! Follow all material manufacturers’ instructions for proper use
and compatibility.
NEEDED MATERIALS AND TOOLS
TOOLS







roller, spray equipment, masking








3
IMPORTANT: The door slab should be nished (painted or stained) on
all six sides with an equal number of coats after all routing, trimming,
boring and touch-up has been completed and it has been properly t
in the jamb. Failure to nish on all six sides and install into a square,
level and plumb condition could result in denial of warranty claims for
operational or performance problems. See our nishing document at
www.jeld-wen.com/resources for nishing requirements and details.
PREPARE JAMBS AND SLAB

from side to side in several places to verify the slab will t. The frame



the slab to operate without rubbing on any ooring.
Frame
Stop