Installation Instructions

Sealant
Please visit jeld-wen.com for warranty
and care and maintenance information.
Thank you for choosing
INSTALLATION INSTRUCTIONS
for Vinyl Windows with Integral Nailing Fin (JII001)
7
©2014 JELD-WEN, inc.; This publication and its contents are owned by JELD-WEN, inc. and are protected under the U.S. Copyright Act and other intellectual
property laws. All trademarks, service marks, logos and the like (whether registered or unregistered) are owned or controlled by JELD-WEN, inc. or others.
Unauthorized use or duplication of JELD-WEN intellectual property is prohibited.
JELD-WEN reserves the right to change product specications without notice. Please check our website, jeld-wen.com, for current information.
(07/14)
COMPLETE INSTALLATION
1. Release the building wrap
from above the header
(previously taped up) and
overlap the header ashing.
Seal the ends with self-
adhesive ashing or building
wrap tape.
2. Adjust window for best
operation.
3. Seal the top corners of the
window with a 1/4" bead
of sealant. Tool into a llet
shape.
CONTINUOUS AIR SEAL
Create a continuous air seal on the interior by integrating the rough
opening and the window frame with low expansion polyurethane foam
or backer rod and sealant.
AFTER INSTALLATION
Ensure weep holes/channels are clear of debris for proper water
drainage. Do not seal weep holes/channels.
Install exterior wall surface per manufactures’ guidelines.
Leave an expansion/contraction gap of approximately 3/8" between
window frame and nal exterior wall surface (siding, stucco, etc.). For
a nished look and additional protection, seal this gap on the sides
with backer rod and sealant. If sealant is applied above the drip cap
ensure the sealant bead is discontinuous to allow for drainage.
Protect recently installed units from damage from plaster, paint, etc.
by covering the unit with plastic.
7