Installation Guide
INSTALLATION INSTRUCTIONS
for Vinyl Windows with Integral Nailing Fin (JII001)
INSPECT ROUGH OPENING
2
REMOVE PACKAGING
Remove shipping materials such as corner covers, shipping blocks or
pads. If there is a protective lm on the glass, do not remove it until
installation and construction are complete.
INSPECT WINDOW
t$PTNFUJDEBNBHF
t1SPEVDUTRVBSFOFTTEJBHPOBMNFBTVSFNFOUTOPUNPSFUIBO
different)
t$PSSFDUQSPEVDUTJ[FDPMPSHSJEQBUUFSOIBOEJOHHMB[JOHFOFSHZ
efciency requirements, etc.)
t$SBDLFEGSBNFXFMET
1
REMOVE PACKAGING & INSPECT WINDOW
Verify Square, Level, & Plumb
A
B
D
C
E
A
B
D
C
E
t7FSJGZUIFXJEUIBOEIFJHIU
of the window are each 1/2"-
TNBMMFSUIBOUIFSPVHI
opening width and height.
.VMMFEVOJUTTIPVMECF
narrower.
t7FSJGZUIFSPVHIPQFOJOH
is square. The (A) and (B)
measurements above should
be the same. Maximum
allowable deviation from
square is 1/8" for windows
20 sq. ft. and smaller, and
GPSXJOEPXTMBSHFSUIBO
20 sq. ft.
t'PSTJEFCZTJEFNVMMFEVOJUTBESJQDBQUIBUFYUFOETUIFMFOHUIPGUIF
frame plus 1/8" overhang on each end is required.
t4QMJUTDSBDLTIPMFTNJTTJOHTFDUJPOTPSPUIFSEBNBHFUPUIFOBJMJOH
åOMPOHFSUIBOBOEPSXJUIJOPGXJOEPXGSBNF
If any of the above conditions represent a concern, or if you expect
FOWJSPONFOUBMDPOEJUJPOTUPFYDFFEUIFXJOEPXhTQFSGPSNBODFSBUJOH
do not install the window. Contact your dealer or distributor for
recommendations.
t7FSJGZUIFSPVHIPQFOJOHJTMFWFMBOEQMVNC$BOE%5IF
NBYJNVNBMMPXBCMFEFWJBUJPOJTGPSFWFSZhPGSPVHIPQFOJOH
(not to exceed 1/8").
t5IFSPVHIPQFOJOHTJMMNVTUOPUCFDSPXOFEPSTBHHFE%
t5IFFYUFSJPSGBDFPGUIFSPVHIPQFOJOHNVTUCFJOBTJOHMFQMBOF&
with less than 1/8" twist from corner to corner.
t.JOJNVNEPVCMFTUVETLJOHBOEKBDLUSJNNFSTIPVMECFVTFEUP
support the header at all rough openings.
PREPARE BUCK
3
Note! This section applies to
installations into a masonry
wall only. For installations
into a stud-framed wall, begin
with section 4, “PREPARE
STUD-FRAMED WALL.”
1. Seal any joint larger than
JOUIFCVDLBOE
between the buck and the
concrete/masonry with
sealant.
2. Cover the buck and the
surrounding concrete/
masonry at the head and jambs with liquid applied ashing as shown.
*GJOTUBMMJOHJOUPBGPVSTJEFECVDLTFBMUIFTJMMJOBTJNJMBSNBOOFS
Note! Shims must be 1/4" shorter than the depth of the window sill,
should level the rough opening sill and be no more than 1/4" thick.
4IJNUIFTJMMGSPNFBDIDPSOFSBUJOUFSWBMTBOEPOCPUITJEFTPG
mull joints with non water-degradable or compressible shims. Secure
shims with sealant. SKIP to section 5, “INSTALL WINDOW.”
Sealant
joints
Liquid
applied
ashing