Installation Guide

INSTALLATION INSTRUCTIONS
for Swinging French and Patio Doors (JII105)
4
PREPARE SILL PAN
INSTALL SILL PAN
PREPARE BUCK
3
4
5
2. Mark a line across
the front and back
of the sill pan.
3. Apply three 3/8"
beads of sealant
between the lines.
4. Place the sill pan in
the rough opening.
Firmly press the sill
pan into the sealant
with a J-roller.
1. Set the sill pan
in the rough
opening, aligning
the front edge (for
continuous slab) or
folded down edge
(for step-down)
with the exterior of
the rough opening.
Sealant
5. For step-down
landings, cut 1/2"
in at this line on
both sides of the
sheetmaterial.
6. For continuous
slab, cut across the
foldingline.
7. Fold the three back
sides up to make a
3-sided box, and, for
step-down landings,
fold the front
apdown.
The sill can be prepared using one of two methods: We recommend
SureSill
Sloped Sill Pan
available from SureSill at www.suresill.com,
building supply stores, and some manufacturing locations. As an
alternative, a sill pan can be fabricated on site, by following the
instructions below. If installing a SureSill
sill pan, follow SureSill’s
instructions for installation and skip to section 6 “PREPARE
STUD-FRAMED WALL“.
1. Cut a piece of sheet
material to the
length shown.
2. Lightly crease folding
lines 1/2" in from the
two short sides and
one long side.
3. Measure the width
of the sill from
the interior to the
nailing n/trim and
add9/16".
4. Take this distance
from the back edge
and lightly crease a
folding line across
the sheet material.
Note! This section applies to installations into a buck only. For
installations into a stud-framed wall, begin with section 6, “PREPARE
STUD-FRAMED WALL.”
1. Seal any joint larger than 1/16" in the buck and between the buck
and the concrete/masonry with sealant.
2. Cover the buck and the surrounding concrete/masonry at the head
and jambs and sill with liquid applied ashing as shown.
3. Apply diamond lath to all ashed surfaces to be covered by stucco.
END of Buck Instructions, SKIP to section 7, “INSTALL DOOR.”
Sealant joints
Liquid applied
ashing
Measure
frame
width
Interior
Continuous slab
Step-down
Fold sides and back up
Fold corner
forward
Fold front
ap down
½" ½"
½" ½"
Sill width
+9/16"
Length of rough opening sill plus 1"
Folding line