Installation Guide
INSTALLATION INSTRUCTIONS
for Vinyl Windows with Integral Nailing Fin (JII001)
2
SAFETY AND HANDLING
SAFETY
• Read and fully understand ALL manufacturers’ instructions before
beginning. Failure to follow proper installation instructions
may result in the denial of warranty claims for operational or
performanceproblems.
• Do not work alone. Two or more people are required. Use safe
liftingtechniques.
• Use caution when handling glass. Broken or cracked glass can cause
serious injury.
• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s
operating instructions.
• Use caution when working at elevated heights.
• If disturbing existing paint, take proper precautions if lead paint is
suspected (commonly used before 1979). Your regional EPA
(www.epa.gov/lead) or Consumer Product Safety Commission ofces
provide information regarding regulations and lead protection.
MATERIALS AND WINDOW HANDLING
• Make sure operable windows are locked prior to installation.
• Heed material manufacturers’ handling and application instructions.
• Protect adhesive surfaces from dirt, moisture, direct sunlight and
folding over onto themselves.
• Handle in vertical position; do not carry at or drag on oor.
• Do not put stress on joints, corners or frames.
• Store window in dry, well-ventilated area in vertical, leaning position
to allow air circulation; do not stack horizontally.
• Protect from exposure to direct sunlight during storage.
• Install only into vertical walls and when conditions and sheathing
aredry.
IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!
MATERIALS AND TOOLS
NEEDED MATERIALS
Note! Follow all material manufacturers’ instructions for proper use
and compatibility. When using flashing, spray adhesive/primer, sealant
and foam products, we recommend using the same manufacturer and
verifying compatibility. It is the End User's responsibility to determine if
dissimilar materials are compatible to the substrates in the application.
• 1 3/4" galvanized roong nails or #8 x 1 1/4" pan head or washer
head (stainless steel recommended) screws. Fasteners must penetrate
at least 1" into framing (or as required by local code).
• For mulled and/or PG50 or above units: #8 x 1 1/4" pan head or
washer head (stainless steel recommended) screws. Screws must
penetrate at least 1" into framing (or as required by local code)
• Sealant: We recommend OSI
®
QUAD
®
Max Sealant or equivalent. This
can be used in any application and can be painted or ordered in a
color matched product, if desired.
• Backer rod 1/8" larger than the widest portion of the gap (used in
conjunction with sealant bead).
• Polyurethane low expansion Window and Door foam: We recommend
OSI
®
QUAD
®
Foam or equivalent).
• Non-compressible or water degradable shims
For installations into a stud-framed wall:
• 4", 6", or 9" (as required by local code and window conguration)
wide self-adhesive ashing: We recommend OSI
®
Butyl Flash Tape
orequivalent.
• Spray adhesive/primer for self adhesive ashing. Such as Loctite
®
300
or equivalent.
• For mulled units, a drip cap 1/8" longer than the frame width is
required.
For installations into a buck:
• Liquid applied ashing (Protecto Wrap LWM 200 or equivalent)
NEEDED TOOLS
• Utility knife
• J-roller
• Hammer
• Tape measure
• Caulking gun
• Level (4' minimum
recommended)
• Drill with bits