Installation Guide

INSTALLATION INSTRUCTIONS
for Vinyl Windows with Integral Nailing Fin (JII001)
2
SAFETY AND HANDLING
SAFETY
Read and fully understand ALL manufacturers’ instructions before
beginning. Failure to follow proper installation instructions
may result in the denial of warranty claims for operational or
performanceproblems.
Do not work alone. Two or more people are required. Use safe
liftingtechniques.
Use caution when handling glass. Broken or cracked glass can cause
serious injury.
Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
Operate hand/power tools safely and follow manufacturer’s
operating instructions.
Use caution when working at elevated heights.
If disturbing existing paint, take proper precautions if lead paint is
suspected (commonly used before 1979). Your regional EPA
(www.epa.gov/lead) or Consumer Product Safety Commission ofces
provide information regarding regulations and lead protection.
MATERIALS AND WINDOW HANDLING
Make sure operable windows are locked prior to installation.
Heed material manufacturers’ handling and application instructions.
Protect adhesive surfaces from dirt, moisture, direct sunlight and
folding over onto themselves.
Handle in vertical position; do not carry at or drag on oor.
Do not put stress on joints, corners or frames.
Store window in dry, well-ventilated area in vertical, leaning position
to allow air circulation; do not stack horizontally.
Protect from exposure to direct sunlight during storage.
Install only into vertical walls and when conditions and sheathing
aredry.
IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!
MATERIALS AND TOOLS
NEEDED MATERIALS
Note! Follow all material manufacturers’ instructions for proper use
and compatibility. When using flashing, spray adhesive/primer, sealant
and foam products, we recommend using the same manufacturer and
verifying compatibility. It is the End User's responsibility to determine if
dissimilar materials are compatible to the substrates in the application.
1 3/4" galvanized roong nails or #8 x 1 1/4" pan head or washer
head (stainless steel recommended) screws. Fasteners must penetrate
at least 1" into framing (or as required by local code).
For mulled and/or PG50 or above units: #8 x 1 1/4" pan head or
washer head (stainless steel recommended) screws. Screws must
penetrate at least 1" into framing (or as required by local code)
Sealant: We recommend OSI
®
QUAD
®
Max Sealant or equivalent. This
can be used in any application and can be painted or ordered in a
color matched product, if desired.
Backer rod 1/8" larger than the widest portion of the gap (used in
conjunction with sealant bead).
Polyurethane low expansion Window and Door foam: We recommend
OSI
®
QUAD
®
Foam or equivalent).
Non-compressible or water degradable shims
For installations into a stud-framed wall:
4", 6", or 9" (as required by local code and window conguration)
wide self-adhesive ashing: We recommend OSI
®
Butyl Flash Tape
orequivalent.
Spray adhesive/primer for self adhesive ashing. Such as Loctite
®
300
or equivalent.
For mulled units, a drip cap 1/8" longer than the frame width is
required.
For installations into a buck:
Liquid applied ashing (Protecto Wrap LWM 200 or equivalent)
NEEDED TOOLS
Utility knife
• J-roller
• Hammer
Tape measure
Caulking gun
Level (4' minimum
recommended)
Drill with bits