Installation Guide
INSTALLATION INSTRUCTIONS
for Swinging French and Patio Doors (JII105)
2
ROUGH OPENINGS
SAFETY AND HANDLING
OPEN-STUD CONSTRUCTION
The wall framing
needs to be covered
by backing support
before the door can
be installed. The
door will be mounted
with the nailing n/
exterior trim ush
against the applied
backingsupport.
This backing support
should be a thin (max.
1/8" thick) sheet
material such as plywood or lauan. Completely surround the rough
opening with the backing support as shown. Backing support must be
applied before building wrap.
This installation guide specically addresses masonry/block wall,
sheathed wall and open-stud construction.
MASONRY/BLOCK WALL CONSTRUCTION
This installation assumes
that a building professional
has already properly
fastened and sealed a
framework of studs (often
called a buck) to the
concrete/masonry wall.
FULLY SHEATHED WALL CONSTRUCTION
The wall framing is covered
by sheathing and the door
will be mounted with the
nailing n/exterior trim ush
against the sheathing. This
installation assumes building
wrap is properly installed
prior toinstallation.
SAFETY
• Read and fully understand ALL manufacturer’s instructions before
beginning. Failure to follow proper installation instructions may result in
the denial of warranty claims for operational or performance problems.
• Do not work alone. Two or more people are required. Use safe
liftingtechniques.
• Use caution when handling glass. Broken or cracked glass can cause
serious injury.
• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s
operatinginstructions.
• Use caution when working at elevated heights.
• If disturbing existing paint, take proper precautions if lead paint is
suspected (commonly used before 1979). Your regional EPA
(www.epa.gov/lead) or Consumer Product Safety Commission ofces
provide information regarding regulations and lead protection.
• WARNING: Drilling, sawing, sanding or machining wood products
generates wood dust, a substance known to the State of California to
cause cancer. Use a respirator or other safeguards to avoid inhaling
wood dust.
MATERIALS AND PATIO DOOR HANDLING
• Make sure the operating panel is secured prior to installation.
• Heed material manufacturer’s handling and application instructions.
• Protect adhesive surfaces from dirt, moisture, direct sunlight and
folding over onto themselves.
• Handle in vertical position; do not drag on oor.
• Do not put stress on joints, corners or frames.
• Store patio door in dry, well-ventilated area in vertical, leaning
position to allow air circulation; do not stack horizontally.
• Protect from exposure to direct sunlight during storage.
• Install only into vertical walls and when conditions and sheathing
aredry.
• Never use solvent-based sealants on vinyl products.
IF INJURY OCCURS, IMMEDIATELY SEEK MEDICAL ATTENTION!
Buck
Trimmer
studs
Header
Sheathing
Sill area
King
stud
Open-Stud with Backing
Sheathed Wall Construction
Masonry/Block Wall Construction