Instructions / Assembly
INSTALLATION INSTRUCTIONS
for Pre-Hung Exterior Entry Doors (JII106)
5
5. Cuttwopiecesof
JELD-WEN self-
adhesive ashing 6"
wide by the sill pan
width+3"long.
a. For continuous
slab landings
only, cut out the
inside corner.
b. Adhere the
pieces of
ashing to the
inside corners.
Stretch ashing
as needed to
cover corners
and lay at.
6. Smooth gaps or
bubbles beneath
self-adhesive
ashing with a
J-roller (remove
and replace if
necessary).
7. Sealbackcornersof
sill pan with sealant.
8. For step-down
landings only, cut
plastic drain screen
to length of sill +
2"andstaple1/2"
below sill edge. The
drain screen provides a path for air to dry any incidental moisture in
the rough opening.
End of Stud-Framed Wall Instructions, continue with section 7,
“INSTALL DOOR.”
FOR RETROFIT INSTALLATIONS
After removing the old door, remove sufcient siding to expose at least
9"ofintactbuildingwrap.Ifdamaged,applynewbuildingwrapina
shiplap manner. Verify header and trimmer studs are structurally sound.
PREPARE BUILDING WRAP
Verifythesestepsdonotvoidthebuildingwrapmanufacturer’s
warranty.
1. Trim building wrap
ush with the
edges of the rough
opening.
2. Atthehead,slit
building wrap 6"
at45°.Tapeupas
shown.
3. Applyspray
adhesive/primer
to the sill pan
and surrounding
area. Follow
manufacturer’s
instructions
for application
methods.
4. Cutapieceof
JELD-WEN self-
adhesive ashing
the length of the sill
and apply over the
sill pan as shown.
The bottom of
the sill pan should
be completely
covered by the self-adhesive ashing. For step down landings, fold
ashing down as shown. For continuous slabs, trim ush with rough
opening.
6
PREPARE STUD - FRAMED WALL
45˚
6"
Sill pan
width
3"
6"
Discard
(for
continuous
slab only)
Continuous Slab
Landing
Sill pan
width
3"
3"
Sealant
1"
1/2"
Step-Down
Landing
Sill pan
width
3"
3"
5
PREPAREBUCK
Note! This section applies to installations into a buck only. For
installations into a stud-framed wall, begin with section 6, “PREPARE
STUD-FRAMED WALL.”
1. Seal any joint larger than 1/16" in the buck and between the buck
and the concrete/masonry with sealant.
2.Coverthebuckandthesurroundingconcrete/masonryatthehead
and jambs and sill with liquid applied ashing as shown.
3.Applydiamondlathtoallashedsurfacestobecoveredbystucco.
END of Buck Instructions, SKIP to section 7, “INSTALL DOOR.”
Sealant joints
Diamond lath
Liquid applied
ashing