Installation Guide
GROUND MOUNT INSTALLATION MANUAL - 5©
2015 IRONRIDGE, INC. VERSION 2.23
5. CLAMP MODULES
A. END CLAMPS
Place rst module in position on rails, a minimum of 1.5”
from rail ends. Secure End Clamps on rails, ensuring they
are hooked over top of module. Torque to 84 in-lbs.
B. MID CLAMPS
Slide Mid Clamp T-bolts in top rail slots, placing them ush
against opposite side of module. Place second module
into position on rails, against Mid Clamp bolts. Put a Mid
Clamp, then ange nut, on each bolt. Torque to 120 in-lbs.
Repeat for each following module.
☑ Refer to WEEB Installation Manual for installing WEEB Clips.
☑ If using Under Clamps or Wire Clips, refer to Page 6.
☑ If using Grounding Mid Clamps, refer to Grounding Mid Clamp
Installation Manual.
C. END CLAMPS
Place last module in position on the rails, a minimum of
1.5” from rail ends. Secure End Clamps on rails, ensuring
they are hooked over top of module. Torque to 84 in-lbs.
D. REPEAT STEPS
Clamp remaining module rows
.
☑ If using End Caps, refer to Page 6.
A
B
C
D
Torque to
84 in-lbs
Torque to
120 in-lbs
Torque to
84 in-lbs