Installation Guide

GROUND MOUNT INSTALLATION MANUAL - 5©
2015 IRONRIDGE, INC. VERSION 2.23
5. CLAMP MODULES
A. END CLAMPS
Place rst module in position on rails, a minimum of 1.5”
from rail ends. Secure End Clamps on rails, ensuring they
are hooked over top of module. Torque to 84 in-lbs.
B. MID CLAMPS
Slide Mid Clamp T-bolts in top rail slots, placing them ush
against opposite side of module. Place second module
into position on rails, against Mid Clamp bolts. Put a Mid
Clamp, then ange nut, on each bolt. Torque to 120 in-lbs.
Repeat for each following module.
Refer to WEEB Installation Manual for installing WEEB Clips.
If using Under Clamps or Wire Clips, refer to Page 6.
If using Grounding Mid Clamps, refer to Grounding Mid Clamp
Installation Manual.
C. END CLAMPS
Place last module in position on the rails, a minimum of
1.5” from rail ends. Secure End Clamps on rails, ensuring
they are hooked over top of module. Torque to 84 in-lbs.
D. REPEAT STEPS
Clamp remaining module rows
.
If using End Caps, refer to Page 6.
A
B
C
D
Torque to
84 in-lbs
Torque to
120 in-lbs
Torque to
84 in-lbs