TileTabs® connectors
are a glue-free
installation system
designed for installation
of J+J Flooring Groups
Nexus® modular carpet
tiles. This system
eliminates the need for
full spread adhesive
which requires dry time.
TileTabs have low odor
which makes them ideal
for use anywhere odor
is a concern and rapid,
mess-free installation is
important.
Make sure you inspect carpet modules prior to installation.
No claims will be honored if modules are installed with
visible defects. Read all instructions prior to beginning
installation.
Site and Modular Material
Conditioning
The building must be enclosed and the
HVAC in continuous operation.
Modules must be conditioned to room
temperature for 48 hours prior to
installation. The ambient air relative
humidity must be below 65% with the
oor and room temperature between
65°F – 95°F. These conditions must be
maintained for a minimum of 48 hours
prior to the installation, during, and at
least 48 hours after completion of the
installation.
Surface Preparation
Dust, dirt, and debris, and non-
compatible adhesive must be removed
before the installation begins. Pre-
existing, dissimilar adhesives must be
either mechanically removed, hand
scraped to bare residue or encapsulated
using Ardex Feather Finish or equal. The
substrate must be smooth and level with
all cracks and holes lled using a Portland
cement based patch reinforced with
polymers.
Note: Failure to remove or encapsulate pre-existing
adhesives may cause installation failure, shifting, buckling,
doming or edge curling; these conditions will not be covered
under warranty when surface preparation instructions are
not followed.
Substrates
TileTabs are recommended for use on
the following:
Concrete on grade, below or above
grade in the absence of excessive alkali
or moisture, hardwood, APA oor
grade
plywood, tile, terrazzo, and well-bonded
existing hard surface oor covering.
Floors must be clean, dry and free of
concrete sealers, existing adhesive,
curing compounds, wax, oil, paint or any
foreign matter that will interfere with a
good bond. The installation site must be
acclimated with HVAC in operation. The
oor and room temperature, as well as
ooring materials must be maintained at
65°- 95°F, and the humidity below 65%
for 48 hours prior to, during, and after
the testing and installation. Do not use
on substrates that have been chemically
cleaned.
Concrete Moisture Testing
and pH Testing
Concrete suboors must be tested for
moisture per ASTM F 2170. On-site
relative humidity readings (ASTM F
2170) must not exceed 80%, and pH must
be between 7.0 and 9.0. With moisture
conditions up to a range of more than
80% RH but not to exceed 90% RH, use
XL Brands Encore DriSeal as directed.
(Contact J+J Flooring Group’s Customer
Service at 800.241.4585 for pricing.)
Subfloors
New Concrete: New concrete must be
fully cured, free of moisture, sound, clean
and meet industry standards as dened in
ACI Committee 302.1.04R Report (see
ASTM F 710). New concrete requires a
curing period of approximately 90 days.
Old Concrete: Old concrete must be
checked for moisture. Dry, dusty, porous
oors must be primed or encapsulated
with XL Brands TriSeal Sealer.
Note: Primers will not correct a moisture problem.
Wood: Wood oors must be smooth and
level. If the oor is uneven, approved
underlayment will be required. Old
nishes must be tested for compatibility
with adhesives or removed and porous
wood primed.
Terrazzo / Marble: Level all grout lines
with Portland cement-based patch
reinforced with polymers. Glossy surfaces
must be sanded for adhesive bond. Waxes
and similar nishes must be removed.
Hard Surfaces: Tiles must be well
secured to the oor or removed. Broken,
damaged, or loose tiles must be replaced.
Modular Placement
Arrows are embossed or printed on the
module backing to show pile direction.
To ensure proper alignment, check
spacing every ten modules. Measure
ten modules; proper spacing should be
within ¼ inch. Continue to check spacing
every ten modules throughout the entire
installation.
Flatwire Cable / Trench Headers
Cable should be centered under modules
and no adhesive used unless approved
by the manufacturer. Trench headers re-
quire a control grid of adhesive on either
side of header panels to prevent move-
ment. It is highly recommended that
these areas be installed ashlar.
Finished Installation
Roll entire job with 75-100 lb. roller after
completion of installation.
Loop Pile Construction
Carpet modules with loop pile construc-
tions may experience yarn blossoming at
the edges, which is consistent with this
type of construction and is not consid-
ered a manufacturing defect. Clipping or
shearing the yarn edges will remedy this
condition.
Replacement Modules
On occasion, it may be necessary to
replace damaged or heavily soiled mod-
ules. Modules can be replaced with new
modules from on-site inventory or from
another area of the installation. A dier-
ence in appearance may be noticed when
modules are replaced; this dierence usu-
ally diminishes in a short time.
Chair Pads
Chair pads are highly recommended for
use under chairs with roller casters. If
chair pads are not used, the appearance
of the modules will decrease and mainte-
nance and/or shifting of the modules may
be required more frequently.
The procedures listed here are our best
recommendations for installing modular carpets.
J+J Flooring Group’s Carpet Installation
Instructions and Carpet Maintenance Instructions
are available at www.jj-tiletabs.com. If you have
further questions, please contact our Customer
Relations Dept: 800-241-4586.
www.jj-invision.com 800 241 4585

Summary of content (2 pages)