User Manual

16
Footswitch
Output
arbhar Control Path:
Connect the Dual Footswitch to the Dual Footswitch Input of làrachd.
Connect the A - Button Gate Output to the Capture Input of arbhar.
Connect the B - Button Gate Output to the Strike Input of arbhar.
This device meets the requirements of the following standards: EN55032,
EN55103-2, EN61000-3-2, EN61000-3-3, EN62311.
Manual Author: Collin Russell
Manual Design: Dominic D’Sylva