Installation Guide
Select 10 Installation Details:
MODELS MODELS MODELS
1900T-10 1900PS1-10 1900PS-10
1900TB-10 1900PS1B-10 1900PSB-10
1900SD2 (*B indicates Baffle Filters)
CABINET: Be sure that the cabinet bottom is level, side to side and front to
rear. PS: Cut an 8” x 8” hole in the bottom of the cabinet, 3/4” in from the rear
wall and on center line. T & PS1: Cut an 8” x 8” wide hole that is 4.25” off
center in the bottom of the cabinet, 3/4” in from the wall. Shelves and top to be
cut to clear 7” round pipe to line up with the bottom cabinet cut out. Also, cut
holes for electrical wires. The location of the cut out determined by the model
you are installing.
ELECTRICAL: Stub enough wire into cabinet to reach in front of vent pipe.
Enter cabinet 2” left (facing hood) of center and 1-1/8” from wall. Remove
splice box cover before mounting.
MOUNTING: Remove black tape holding dampers closed. Insert canopy
below the cabinet, being sure your vent opening and electrical cut outs line up
with cabinet cut outs. Use the Key Hole mounting holes to secure the canopy.
After hood is mounted attach house wires to leads in the hood. Secure locknut to
conduit and check wiring for compliance to local building codes. FINISH:
Replace splice box cover. Connect duct and tape all joints. Install filters.
Duct Sizes Indicated in Model # (Ex: 1936PS-10-8)
** - 8 = 8” DUCT PIPE
** - K=10” DUCT PIPE
10"
1
1
-
3
/
4"
7"
9-1/
8
"
4
-
1
/
4
"
3
/
4
"
7/8"
2"
2"
3
0
"
,
3
6
"
,
4
2"
o
r
4
8"
22"
3"
2
9
-
1
3
/
1
6
,
3
1
-
1
3
/
1
6
,
4
1
-
1
3
/
1
6
,
o
r
4
7
-
1
3
/
1
6
(
+
/
-
1
/
1
6
”
)
1900PS-10
1900PSB-10
10-
1/16”
1900T-10
1900TB-10
1900PS1-10
1900PS1B-10
1900SD2-10