User Manual

Table Of Contents
8. Observe the following:
NOTE: The following information describes the standard cable routing for this component. For more
information on optional cable routing, see the HPE ProLiant DL360 Gen10 Server cabling matrix on the
Hewlett Packard Enterprise website (http://www.hpe.com/info/CablingMatrixGen10).
9. Connect the optical drive cable to the optical drive backplane and to the SATA optical/storage drive
connector.
10. Install the access panel (Installing the access panel on page 31).
11. Install the server in the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server (Power up the server on page 30).
Hardware options installation 75