HP StorageWorks XP Audit Log reference guide for the XP12000/XP10000 and SVS 200 (5697-7157, November 2007)

Table Of Contents
TrueCopy z/OS function (for IBM z/OS)
Change Option
Change Option operation
Normal end
The operation has ended normally.
Seq.=xxxxxx
Sequence number of the log entry (000000 to 999999)
Detailed Information
Detailed information for this operation is shown in the following table.
Table 223 Detailed information for Change Option operation
DescriptionItem
The maximum number of initial copy operations set.Max Initial Copy
The path blockade watch period set. The unit is second.Path Blockade Watch(s)
The path blockade SIM watch period set. The unit is second.Path Blockade SIM Watch(s)
The CU number of the CU on the primary site.CU
Indicates whether the remote copy related SIM is reported or not.Service SIM
Report, Not Report
Indicates whether the host supports PPRC or not.PPRC Support
Yes: Support, No: Not support
The SCP delay time when the pair is suspended. The unit is second.SCP Delay Time(s)
The number of CUs set.Num. of CUs
Change Pair Option operation
user-name,xx,YYYY/MM/DD,HH:MM:SS:xxx,00:00,[TC z/OS(R)],Change Pair Option,,Normal end,
Seq.=xxxxxx
+{M-VOL(CU:LDEV),Fence Level,CFW, Error Level,Result}=
-{0x00:0x00,Never,Copy To R-VOL,Group,Normal End},{0x00:0x01,Never,Copy To R-VOL,Group,
Normal End},(snip)
-(snip), Num. of Pairs=xx
[TC z/OS]
TrueCopy z/OS function (for IBM z/OS)
Change Pair Option
Change Pair Option operation
Normal end
The operation has ended normally.
Seq.=xxxxxx
Sequence number of the log entry (000000 to 999999)
XP Audit Log reference guide 241