HP StorageWorks HSG80 ACS Solution Software V8.8 for HP-UX Installation and Configuration Guide (AA-RV1FA-TE, March 2005)
FC Configuration Procedures
161HSG80 ACS Solution Software V8.8 for HP-UX Installation and Configuration Guide
Figure 42 shows a controller pair with failover cabling showing one HBA per
server with HSG80 controller in transparent failover mode.
Figure 42: Controller pair failover cabling
Configuring a Controller Pair Using CLI
To configure a controller pair using CLI involves the following processes:
■ "Configuring Controller Settings", page 162
■ "Restarting the Controller", page 163
■ "Setting Time and Verifying All Commands", page 163
■ "Plugging in the FC Cable and Verifying Connections", page 166
■ "Verifying Installation", page 167
1. Enter a
SHOW THIS command to verify the node ID:
SHOW THIS
See "Worldwide Names (Node IDs and Port IDs)", page 60, for the location of
the sticker.
1 Controller A
2 Controller B
3 Host port 1
4 Host port 2
5 Cable from the switch to the host FC adapter
6 FC switch
CXO6887B
6
6
5
5
1
2
4
3