HP ProLiant Storage Server 4U Rail Installation Instructions (5697-5595, March 2006)
*5697-5595*
Les "Viktig sikkerhetsinformasjon" på dokumentasjons-CDen før du installerer dette produktet.
Læs dokumentet Vigtige sikkerhedsoplysninger på dokumentations-cd'en, før produktet installeres.
Prima dell'installazione, leggere sul CD le Informazioni importanti sulla sicurezza.
Tärkeisiin turvatietoihin" Documentation CD -levyllä ennen tuotteen asentamista.
Läs dokumentet Viktig säkerhetsinformation på dokumentations-cd:n innan du installerar denna produkt.
Important Safety Information
About this document
This document provides procedures for installing a 4U-size storage
server into a rack using the rails provided. HP assumes that you are
qualified in servicing computer equipment, and trained in recognizing
hazards in products with hazardous energy levels.
Kit contents
1 Rack rail assemblies (2)
2 Server rails (2)
Warnings and cautions
WARNING! Before you begin, make sure that the rack is
sufficiently stable. If provided, lower the rack leveler feet and make
sure any required stabilizers are installed. If provided, extend the rack
anti-tip device. Failure to extend the anti-tip device could result in
personal injury or damage if the rack tips over.
CAUTION: Make sure that the rack and all equipment mounted
in the rack have a reliable ground connection. Verify that the total
current of the rack components does not exceed the current rating of
the power distribution unit or outlet receptacles.
Rack planning procedures
The rack resource kit ships with all HP branded or Compaq branded
9000, 10000, and H9 series racks. For more information on the
content of each resource, see the rack resource kit documentation.
If you intend to deploy and configure multiple servers in a single rack,
refer to the white paper on high-density deployment at the following
HP web site:
www.hp.com/products/servers/platforms
Prepare storage server
To remove the shipping bracket from the PCI slots, loosen the
thumbscrew (1) and remove and discard the shipping bracket (2).
NOTE: The shipping bracket is used only to secure the PCI
latches during shipping.
Storage server installation
1. Install the server rails on both sides of the server chassis.
2. Pull the rail compression lever toward you.
3. Install the rear of one rail assembly into the designated holes at the
rear of the rack.
4. Install the front of the rail assembly into the designated holes at the
front of the rack.
5. Install the other rail assembly on the opposite side of the rack using
the steps above.
6. Pull the inner slide rails on both sides forward until they lock into
place 1. Slide the inner bearing braces forward until they stop 2.
1
2
cl_001
1
2
cl_002
cl_003
cl_004
cl_005
cl_006
2
1
1
cl_007
HP ProLiant
Storage Server 4U rail
installation instructions
© Copyright 2006 Hewlett-Packard Development Company, L.P.
First edition, March 2006
Product names mentioned herein may be trademarks of their respective
companies as reflected by an associated footnote.
The information in this document is subject to change without notice.
www.hp.com