Installation & Assembly

PLAN AHEAD
Before beginning installation, check local building codes reg
arding footings, location and other requirements.
Study and understand this instruction.
Important information and helpful tips will make your
installation easier and more enjoyable.
Tools and Materials: There are some basic tools and materi
als you will need for the installation. Decide which method of
anchoring and the type of foundation you wish to use in order
to form a complete list of the materials you will need.
BEFORE YOU BEGIN
Assembly I
nstruction: Instructions are supplied in this man
ual and contain all appropriate information for your installati
on. Review all instructions before you begin, and during
assembly, follow the step sequence carefully for correct
results.
Parts List: Check to be sure that you have all the necessary
parts and quantities in your package.These are packaged
within the carton. Note that extra fasteners have been
supplied for your convenience.
Explosion Diagram: All parts except screws and bolts are
shown in this diagram, review all p
arts before you begin.
Familiarize yourself with the hardware and fasteners for
easier use during installation.
Assemble base bars from (B1) to (BR) with screws (F1) as
following pictures shown. Make sure the base bar assembly
in a perfect square.
Note: Take care of sharp edges.
1
PART NO.
Qty.
B1
B2
BL
BR
F1
V2
1
1
1
1
8
8
front
(B2)
(BR)
(BL)
(B1)
F1
F1
F1
V2
(W2A)
(W1A)
(W2A)
(W2A)
(W1A)
(W1A)
(W1A)
(W2A)
(W3A)
(W1A)
(S2)
(M3)
(M4)
(P3)
(P1)
(P1)
(P2)
(L3)
(DL2)
(BR)
(BL)
(B2)
(B1)
(M4)
(M3)
(M3)
(URA)
(ULA)
(UP1)
(GC)
(GC)
(GC)
(GC)
(L1)
(S3)
(L2)
(S4)
(M3)
(DX1)
(DX1)
(DD)
(DU)
(DL1)
(DR1)
1.Q: Missing parts when received.
A: Please check if you already received 2 boxes we shipped to you. Some-
times the 2 boxes will not arrive in same date, hope you can wait for 2-3 more
days or contact us for more help. If you already have 2 boxes, please kindly
send us messages to let us know the number of missing part regarding to the
parts list. We will send replacement to you asap.
2.Q: Some parts damaged when arrived.
A: Please send clear photos about damaged part to us as attachment, we will
check and offer you best solution soon.
Attention:
1. We are concerned about each customer's experience, if there is any loss
or damage, please contact us at any time, we will provide solutions for you
soon.
2. It is recommended to assemble more than 2 people, be careful during
installation to avoid injury.
3. There is a protective film on the surface of the product. If there are minor
scratches, please remove the protective film. (The protective film can protect
the product from scratches. Recommending not to remove the protective film
if not necessary.)
Q&A
Connect the door panel with the door column via screws (F3) as
pictures shown.
10
PART NO.
Qty.
F3 8
(DA)
(UL)
F3
F3
F3
Then reinforce the door panels with assembly (DX1)
9
PART NO.
Qty.
DX1
2
F3 5
-②
.
Place the wall panels (W2A) on the base bars four corners ,
and secure with screws (F1) as showing. Side wall of the shed
line up the holes with base bar.
2
PART NO.
Qty.
W2A
F1
4
16
Long
Short
(W2A)
(W2A)
(W2A)
(W2A)
(W2A)
(W2A)
frontdoor
W2A
W2A
W2AW2A
F1
F1
front
V2
V2
16
3
PART NO.
Qty.
UP1
L1
L2
L3
F1
1
1
1
1
16
(L1)
(L3)
(L1) (L2)
(L3)
(L1) (L2)
(UP1)
Place the top angle bars (L1), (L3), (L2) and (UP1) on the top
of wall panel. Line up the holes with wall panels and fix with
screws (F1).
F1
F1
(UP1)
V2
S2
V1
16
V2
16
Then secure the remaining wall panels around the base
bars with screws (F1).
NoteMake sure the overlapping position.
4
PART NO.
Qty.
W1A
W3A
F1
5
1
42
(W1A)
(W1A)
(W1A)
(W1A)
(W1A)
(W3A)
W1A W3A
W2A
W1A
W2A
W1A
W2A
W1A W1A
W2A
frontdoor
F1
F1
V2
V2
Note : Do not assemble any screws
at these 4 points in this step.
V2
42
Place the left door column (ULA) on the top of base bar (B1),
insert into the wall panel. Then secure the (UL) with screw (F1).
Repeat the same for the right door column (URA).
Note: Deep opening of the door column is on the top and
shallow is below.
5
PART NO.
Qty.
ULA
URA
F1
1
1
8
up
down
Place 3 piece of the gable panels (S2), (S3) and (S4) on the
top angle bars with screws (F1). Then connect (S2) with (S3)
and (S4) via screws (F2) as following pictures shown.
6
PART NO.
Qty.
S2
S3
S4
F1
F2
1
1
1
16
4
(ULA) (URA)
(S2)
(S3)
(S4)
F1
F1
F1
(URA)
(ULA)
(V2)
F2
F2
F2
(S4)
(S2)
V2
V2
V2
8
V1
8
V2
16
Assemble the roof ashing (M3) and (M4).
8
PART NO.
Qty.
M3
M4
GC
F1
4
2
4
6
(M4)
(M3)(M3)
(M4)
(M3)(M3)
(GC)
(GC)
(GC)
(GC)
(M3)
(M3)
F1
(M3)
F1
(M4)
Assemble the components of the door first, please pay attention
to hole alignment.
9
PART NO.
Qty.
DD
DU
DL1
DL2
DR1
F3
1
1
1
1
1
12
(DD)
(DU)
-①
V1
6
V2
6
PART NO.
Qty.
B1
B2
BL
BR
UP1
L1
L2
L3
W1A
W2A
W3A
P1
P2
P3
1
1
1
1
M3
M4
ULA
1
1
1
1
5
4
1
2
1
1
4
2
1
Parts List
S2
PART NO.
Qty.
1
URA
1
S3
S4
GC
F1
F3
F2
1
4
62
8
4
V1
V2
DD
DU
DL2
DR1
DL1
1
1
1
1
1
DX1
1
2
170
144
Parts List
3x5 Metal Garden Shen
Recommended to wear gloves to avoid scratches
2-3
Place the roof panels (P1), (P2) and (P3) on the top.
Note: The groove protruding on the roof panel should be
aligned with its corresponding side panel groove position.
7
PART NO.
Qty.
P1
P2
P3
F1
2
1
1
32
(P2)
(P2)
(P1)
(P1)
(P3)
(P2)
(S3)
(V
1)
F1
Note: The groove protruding on the roof panel should be
aligned with its corresponding side panel groove position.
V1
32
V2
32
F1
V1
P2
S3
1519mm
1519mm
837mm
837mm
1468mm
784mm
784mm
810mm
935mm
M4X10
M4X10
M5X12

Summary of content (1 pages)