Installation Guide

40
PARTS REQUIRED:
Nail lower edge of eave wall panels to  oor frame using 2" nails 6" apart.
Angle nail to hit  oor frame (Fig. D).
6
Secure eave wall bottom plates to  oor using 3" nails (Fig. D).
Remove temporary brace.
7
8
3" (7,6 cm)
x12
2" (5,1 cm)
x25
EAVE SOLID WALL
3" (7,6 cm)
Nails
You have  nished standing your eave solid wall.
FINISH
9
Nail 2" nails fi rst.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. D
6"
(15,2 cm)